Reported 04/02/2020 12:00 AM
Project Title

Redmond Avenue Drainage Project Phases 2 and 3

Physical Address View project details and contacts
City, State (County) Glassboro, NJ 08028   (Gloucester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be constructed as a multi-phase project that will include the installation of primarily 36-inch diameter reinforced concrete pipe (155 LF Phase 2, 261 LF Phase 3). Each phase of construction will include custom drainage structures (vaults) to supplement the existing system and restoration (pavement, curb, and sidewalk). The work must be substantially completed between May 18, 2020 and August 18, 2020 to coincide with the summer schedule of Rowan University.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents