Similar Projects
Deer Mountain Residential Redevelopment
New Construction, Infrastructure
Conception
SD

Mother Of God Monastery Public Housing
New Construction, Renovation, Infrastructure
Conception
Watertown, SD 57201

St. Cloud Street Reconstruction - 5th Street to Highland Court
Infrastructure
Bidding
Rapid City, SD 57701

5th Street Panel Repair - Minnesota to Stumer
Infrastructure
Bidding
Rapid City, SD

SD NPS Pp 2020(1), Pavement Preservation South
Post-Bid
SD

Saint Patrick Street Reconstruction
Post-Bid
Rapid City, SD 57701

I-29 Exit 73 Interchange Improvement
Results
Less than $800,000 est. value
Tea, SD 57064

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

AC Surfacing, Approach Slab, Guardrail - PCN - 04F0 Yankton Area
Infrastructure
Bidding
SD

Paver Patching
Post-Bid
SD

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

Bridge Deck Polymer Chip Seal - PCN - 07D
Infrastructure
Bidding

Paving Indefinite Delivery Indefinite Quantity (IDIQ)
Post-Bid
$2,000 to $2,500,000 est. value
Rapid City, SD

North Rochford Road and Hanna Road Mill and Asphalt Overlay - Phase 4
Results
$700,020 est. value
Central City, SD 57754

Elkton Utility Improvements - Phase II
Infrastructure
Bidding
Elkton, SD

Last Updated 09/30/2021 12:06 PM
Project Title

Bridges and Box Culvert Renovations at Wind Cave National Park

Physical Address View project details and contacts
City, State (County) Hot Springs, SD   (Fall River County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of spall repair, crack repair, joint repair, deck overlay, & guardrail repair at the Beaver Creek Bridge; guardrail repair & timber deck repairs at the Pigtail Bridge; and guardrail replacement at the Box Culvert. All work at the three locations shall be completed in one phase. The contractor will be allowed to work at all three locations at the same time or one location at a time depending on their schedule. Traffic must be maintained during all work except the concrete repairs & overlay of the Beaver Creek Bridge which will require full closure and detour.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents