Similar Projects
Kroger #118-01 - Site Work Only
New Construction
Design
Spring, TX 77388

East River Phase I
New Construction - 649,156 SF
Design
Houston, TX 77020

Imperial Heights Clearing & Grubbing
Bidding
Houston, TX

District Meeting Facility
Post-Bid
Houston, TX

Development and/or Redevelopment of 410/402 Pierce Street
Post-Bid
Houston, TX 77002

Construction of the Land Management for the US 290/Hockley Tract
Results
TX

Construction of the Grand Oaks Mass Excavation to Serve Grand Oaks Development
Results
TX

Air Center Distribution Center Detention Pond
New Construction
Construction
Houston, TX 77000

UPS Sweetwater
New Construction, Renovation, Demolition - 15,000 SF
Construction
$300,000 est. value
Houston, TX 77037

PO/TBA Project
New Construction
Pending Verification
Channelview, TX

The Emery/Weiner School Parking Lot
New Construction - 80,000 SF
Design
Houston, TX 77025

Dowdell Boat & RV Storage
New Construction - 12,160 SF
Post-Bid
$500,000 est. value
Tomball, TX 77375

Miramesa West Mass Grading for Lots
Results
Less than $1,500,000 est. value
Houston, TX 77002

Villa D’Este Bayou Bank Planting & Amenities
Renovation
Construction
$669,020 est. value
Houston, TX 77056

Ground Up Construction Project Harmony School Of Endeavor – El Paso
Post-Bid
Houston, TX 77000

Last Updated 07/19/2019 12:22 PM
Project Title

Memorial Park Central Connector

Physical Address View project details and contacts
City, State (County) Houston, TX 77007   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project scope, schedule and intended Contractor Procurement Plans will be presented at Post Oak Conference Center, 2000 Post Oak Boulevard, Three Post Oak Central, Houston. Date/Time: Thursday July 25, 2019, 11:30am – 1:00pm Follow-up: Firms interested in the General Contractor role may sign up for one-on one meetings with the Owner Team on Friday, July 26 and Monday, July 29. Further details will be provided at Industry Day
Details Site Development, New Construction.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Grading, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents