Similar Projects
Designer and Construction Administration Services for Twenty Furnace Replacements
Alteration
Bidding
New Bedford, MA

Install Owner Furnished GAC System in Pre-Engineered Building - Sub-Bids
Alteration
Sub-Bidding
$6,000,000 est. value
Mansfield, MA

Harold H. Galligan School Window, Exterior Door and Boiler Replacement Project - Sub-Bids
Alteration
Sub-Bidding
$1,350,000 est. value
Taunton, MA 02780

Renovation of Lobby and Security Upgrades - Corrigan MHC Sub-Bid
Post-Bid
Less than $295,000 est. value
Fall River, MA 02720

On-Call, Routine and Emergency Heating System
Term Contract
Post-Bid
Less than $98,000 est. value
New Bedford, MA

HVAC System Replacement at the District 5 Administration Building
Results
Less than $380,000 est. value
Taunton, MA 02718

Building Envelope Upgrades & Boiler, DHW and Toilet Replacement - Filed Sub Bid
Renovation
Results
$817,328 est. value
Taunton, MA

Walsh Well PFAS Treatment, Plant Upgrades - Sub Bids
Alteration
Sub-Bidding
$6,000,000 est. value
Mansfield, MA 02048

Replacement of Rooftop Unit
Post-Bid
Less than $150,000 est. value
New Bedford, MA

Dottin Place Administration Building HVAC Systems Upgrade Project
Results
$145,000 est. value
New Bedford, MA 02745

Air Vent Cleaning of Aviation Hangars
Post-Bid

Brickenwood Administration Offices New HVAC Project
Results
Less than $50,000 est. value
New Bedford, MA 02746

HVAC and Mechanical Products
Term Contract
Post-Bid

Furnace and Domestic Water Heater Replacement - Sub Bid
Results
Less than $235,000 est. value
New Bedford, MA 02745

Ford Middle School Evaporators and Condensers Replacement
Post-Bid
Acushnet, MA 02743

Last Updated 02/01/2022 03:44 PM
Project Title

HVAC Upgrades of Floriculture Building - General Bids Due

Physical Address View project details and contacts
City, State (County) Dighton, MA 02715   (Bristol County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Includes replacement of existing gas furnaces with new gas-fired furnaces with Dx cooling and associated outdoor condensers located in the Floriculture Building and connecting these new components to the new direct digital control system currently being installed on campus.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents