Similar Projects
CDBG Concrete Rehabilitation
Alteration
Bidding
$450,000 est. value
Rancho Cucamonga, CA 91730

CDBG ADA Concrete Ramps Construction
Infrastructure
Bidding
$175,000 est. value
Ontario, CA

Master As-Needed Agreement M14 Curb Ramp Construction
Infrastructure
Post-Bid
$1,000,000 est. value
San Francisco, CA

ADA Improvement Project 31540-42 Railroad Canyon Road
Alteration
Post-Bid
Canyon Lake, CA 92587

Fancher Creek Trail
Infrastructure
Results
$669,877 est. value
CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Measure L Sidewalk Project - Airport Neighborhood Active Transportation Connectivity & Safety Project
Term Contract
Bidding
$3,300,000 est. value
CA

Citywide Sidewalk Repair for Disabled Accessibility, I-135
Infrastructure
Post-Bid
$1,200,000 est. value
Torrance, CA

Accessible Improvement Program - Phase 1
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Oakland, CA

Place Curb Ramps, Sidewalk, Driveways and Accessible Pedestrian Signal
Infrastructure
Bidding
$2,260,000 est. value
CA

West Silver Eagle Bridge and Overhead Joint Repair
Renovation, Infrastructure
Post-Bid
$565,560 est. value
Sacramento, CA 95834

Pedestrian Uc, Construct Ramps, Sidewalks and Retaining Wall
Infrastructure
Results
$3,230,000 est. value
CA

Sidewalks - Dlr Drive
Infrastructure
Bidding
$180,000 est. value
Temecula, CA 92591

Quick Build Pedestrian Improvements Project
Infrastructure
Post-Bid
$73,500 est. value
Millbrae, CA 94030

ADA Curb Ramp Installation
Infrastructure
Results
Less than $700,000 est. value
Ripon, Stockton, CA 95202

Reported 05/12/2022 12:00 AM
Project Title

Curb Ramp Construction and Misc Concrete Repairs for Pavement Management 2022 and 2023 Projects and Other Curb Ramp Locations as Needed

Physical Address View project details and contacts
City, State (County) San Ramon, CA   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is located in various neighborhoods in the City of San Ramon, within the limits of the Pavement Management 2022 & 2023 Projects and other locations as needed. The Project is described as follows: demolition, and reconstruction of approximately 130 curb ramps to meet current Americans with Disabilities Act (ADA) and City requirements. The work also includes miscellaneous concrete repairs of sidewalks, curbs, gutters, valley gutters, median curbs, driveways, and similar items. The items listed in this contract are to be completed prior to the asphalt concrete pavement phase of the Pavement Management 2022 & 2023 Projects. The Project must be complete in at least two phases. For each phase, the City will issue a Work Order. Work Order No. 1 and Work Order No. 2 are related to the Pavement Management 2022 & 2023 Projects, respectively. Any other work order afterwards is related to as-needed cases. Work Order No. 1 consists of the reconstruction of approximately 20 ADA curb ramps and all miscellaneous concrete repairs in the same neighborhoods. Work Order No. 2 is the reconstruction of approximately 100 ADA curb ramps and all miscellaneous concrete repairs in the same neighborhoods.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents