Similar Projects
Reported | 04/04/2020 12:00 AM |
Project Title | Civil Engineering and Construction Phase Services |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX (Harris County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Project Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Constructed certain levee and drainage improvements to provide protection to the land and improvements of residential and commercial property owners in the master-planned community known as New Territory from flooding from storm water and the Brazos River. LID 7 desires to design and construct erosion mitigation and control improvements on the northern bank of the Brazos River because of recent and ongoing erosion of the river bank that, left unchecked, will threaten the District's levee system (the "Brazos River Erosion Control Project"). LID 7 is soliciting qualification statements for civil engineering services to prepare construction drawings, specifications, bid package and provide construction phase services for the Brazos River Erosion Control Project. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |