Wastewater Treatment Plant System Upgrade
Addition
Conception
$250,000,000 est. value
Sacramento, CA

California Waste Solutions Recycling Facility
New Construction - 170,765 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94607

City Distribution Division Campus at 2000 Marin
New Construction, Demolition
Bidding
$225,000,000 est. value
San Francisco, CA 94124

Plant Structural Improvements
New Construction
Bidding
$2,500,000 est. value
Modesto, CA 95351

Digester 1 Rehabilitation
Renovation
Sub-Bidding
Redwood City, CA

Process Control Systems Integrator (PCSI) Supply and Installation
New Construction
Post-Bid
San Francisco, CA

Wastewater Treatment Plant Improvement Project
New Construction
Post-Bid
Riverdale, CA

Biosolids Digester Facility - Building 610 Wave 1
New Construction
Results
$939,000,000 est. value
San Francisco, CA 94124

Water Recycling Facility Advanced Water Treatment Facility Project
New Construction, Renovation
Results
$15,000,000 est. value
Santa Paula, CA 93060

Southeast Plant New Headworks Construction - Scope III
New Construction
Bidding
San Francisco, CA

ATS Replacement at Sutter WWTP
Renovation
Post-Bid
$780,000 est. value
Modesto, CA 95351

Water Pollution Control Plant Building 042 Primary Clarifier Improvements
Renovation
Results
$6,500,000 to $7,000,000 est. value
San Francisco, CA

New Treasure Island Wastewater Treatment Plant
New Construction
Bidding
$158,000,000 est. value
San Francisco, CA 94130

Primary Clarifier Rehabilitation No 2 and 4
Renovation
Post-Bid
$950,000 est. value
Fairfield, CA 94534

Install Water/Wastewater Systems and Landscape Work
New Construction
Results
$7,100,000 est. value
CA

Reported 02/17/2022 12:00 AM
Project Title

Biosolids Digester Facilities - Southeast Treatment Plant Electrical Package 1

Physical Address View project details and contacts
City, State (County) San Francisco, CA   (San Francisco County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This work will be performed at the Southeast Treatment Plant. This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times. A brief description of the work. Full Electrical, Controls and Instrumentation installation including but not limited to All wiring, disconnects, junction boxes with various ratings – including power, controls, instrumentation. All unscheduled services – lighting, Security, Communications, and small power Installation of PCSI and DCS provided equipment such as – field-bus control panels, PLC panels. Installation of 12.47/480v Substations and associated primary wiring. Installation of 480V SWGR and IntelCenter MCCs. Ductbanks and excavations. Demolition and relocation of services. To existing pumping stations, proposed new W2 pump station, Ferric Chloride systems, piping service tunnels and other process related infrastructure within the Southeast Plant. T-40.02 - Process Mech HVAC- Furnish and install all process mechanical equipment including but not limited to pumps, valves, and appurtenances.- Furnish and install specialty process equipment including but not limited to gravity belt thickeners, storage hoppers, polymer system and centrifuges.- Furnish and install HVAC systems.- Trenching, excavation, offhaul, and backfill for all buried piping.- Commissioning and maintenance of equipment.- Design, furnish, and installation of pipe support systems and seismic bracing.Specialty shop-applied and field-applied coating systems for piping and equipment. T-40.06 - To Process Mechanical- Furnish and install all process mechanical equipment including but not limited to pumps, valves, piping, and appurtenances.- Trenching, excavation, offhaul, and backfill for all buried piping.- Demolition of existing pumps, piping, and coring of existing structures.- Furnish and installation of storage tanks.- Furnish and installation of splash guards.- Commissioning and maintenance of equipment.- Design, furnish, and installation of pipe support systems and seismic bracing.- Specialty shop-applied and field-applied coating systems for piping and equipment. T-22.02 - The Area and Building Services Plumbing 2- Installation of a complete plumbing system, including all piping and equipment.- Trenching, excavation, offhaul, and backfill for buried piping.- Coordination with other trades to install concrete-encased piping.- Specialty shop-applied and field-applied coating systems for piping and equipment. Local Business Enterprise - 12%

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents