Similar Projects
Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Savannah Cove Subdivision
New Construction, Infrastructure
Conception
$27,000,000 CJ est. value
Merrillville, IN 46410

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Subdivision - Goodwill Store
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Crown Point, IN 46307

Pavement Replacement
Infrastructure
Bidding
$5,828,562 CJ est. value
Bloomfield Township, IN 46761

Replace Superstructure
Demolition, New Construction, Infrastructure
Bidding
$2,478,381 CJ est. value
Anderson, IN 46013

Asphalt Paving and Site Improvements
Post-Bid
Indianapolis, IN 46214

Glendale Branch Library Replacement
Renovation
Post-Bid
Indianapolis, IN 46220

Leonard Park Phase 2 - Site & Building Improvements
Infrastructure
Results
Speedway, IN 46224

Training Academy - Bid Package 1 Sitework
Infrastructure
Results
$1,200,000 to $1,700,000 est. value
Indianapolis, IN 46235

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

Containers on College
New Construction, Infrastructure - 15,800 SF
Pending Verification
$5,000,000 CJ est. value
Indianapolis, IN 46202

St. John Commons
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Dyer, IN 46311

SR 60 - Slide Correction
Infrastructure
Conception
$517,000 CJ est. value
Mitchell, IN 47446

Last Updated 01/30/2023 04:33 PM
Project Title

Wabash Carnegie Public Library Renovation & Addition

Physical Address View project details and contacts
City, State (County) Wabash, IN 46992   (Wabash County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Library - Public, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,150,000 [brand] Estimate
Plans Available from Copy Center - 01/10/22
Owner View project details and contacts
Architect View project details and contacts
Description

Owner will receive sealed lump sum bids until the bid time and date at the location given below. Owner will consider bids prepared in compliance with the Instructions to Bidders issued by Owner, and delivered as follows: Project consists of the expansion and interior renovation of the existing library. Work is indicated in the Contract Documents. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. Bid security shall be a certified check or bid bond and shall be the bidder's guarantee that said bidder will, if the contract is awarded to said bidder, execute within ten (10) days of acceptance of his bid, a Contract for the work bid upon. All bid bonds shall be made payable to the Owner and be executed by a surety company authorized to do business in the State of Indiana. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. B. An out-of-state contractor will have Indiana State Gross Income Tax withheld by the Owner, unless they can show proof that they are registered with the Indiana Secretary of State to conduct business in the State of Indiana. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. It is the intention of the Owner that construction of the project will start by March 1,2022. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. B. The successful bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their contract amount prior to execution of contracts. Bonds shall be in full force and effect for a period of at least 12 months after the date of final completion and acceptance of the longest guarantee provided under the contractor's contract. Should the contractor's bonding company default; the contractor will be responsible for securing a new bond within fourteen (14) calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The range for this project is between $3-4 million.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents