Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

Construction of the 2019 Fire Flow Projects
Results
UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

2019 Public Works Project
Results
Hyrum, UT 84319

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

2020 Water Line Projects - 100 E, 200 E, and 300 E
Post-Bid
Midway, UT 84049

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

Scenic Drive Upper Conduit Slipline Project
Results
Less than $695,500 est. value
Salt Lake City, UT 84104

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Last Updated 02/03/2021 09:26 AM
Project Title

Porter Rockwell Boulevard Segments 4 & 5 Water Line and Street Lighting

Physical Address View project details and contacts
City, State (County) State-Wide: UT
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,419,075
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Principal items of work for the project are approximately as follows : Furnish all labor, equipment and materials required to install a new water line, along with the installation of decorative street lighting, according to plans and city standards. Phase One : Includes all work up to Station No. 117 and from Station No. 132 to the end of Harmon Day Drive. Phase Two : Starts at Station 117 and ends at 132 (except for the Porter Rockwell Bridge) and will begin once construction of curb, sidewalk and road pavement are completed. This is expected to occur before March 1, 2022.

Details

Division 26 - Electrical, Exterior Lighting, Roadway Lighting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents