On Call Asbestos Removal and Abatement at Various Boston Public Schools
Term Contract
Post-Bid
Boston, MA

On Call Environmental (Non-Hazardous Materials) Abatement Services
Post-Bid
Boston, MA

Asbestos Abatement Services
Results
Braintree, MA

Asbestos Removal - Oldham School Floors
Results
Norwood, MA

Washington Street Units
New Construction - 21,700 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Franklin, MA

Removal of Asbestos at Boston City Hall
Alteration
Post-Bid
Boston, MA

Abatement of Asbestos-Containing Floor Tile and Mastic
Results
$57,600 est. value
Braintree, MA

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

2022 Asbestos Abatement
Alteration
Results
$50,000 to $150,000 est. value
Braintree, MA 02184

Asbestos Abatement Services
Alteration
Post-Bid
$10,000 to $50,000 est. value
Braintree, MA

Abatement of Asbestos-containing Floor Tile and Mastic at the Flaherty Elementary School
Term Contract
Results
$75,000 est. value
Braintree, MA 02184

Asbestos Sampling, Testing, and Monitoring
Term Contract
Post-Bid
Quincy, MA

Dover Community Center - General Bid
Renovation, Addition - 20,000 SF
Post-Bid
$13,700,000 est. value
Dover, MA 02030

Dover Community Center
Renovation, Addition
Post-Bid
$13,700,000 est. value
Dover, MA 02030

Asbestos Abatement of the Existing Caryl Community Center
Alteration
Post-Bid
$13,800,000 est. value
Dover, MA 02030

Reported 05/17/2022 12:00 AM
Project Title

Asbestos Abatement of the Existing Caryl Community Center - General

Physical Address View project details and contacts
City, State (County) Dover, MA 02030   (Norfolk County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Clubhouse/Social Club, Environmental
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $13,800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Required DCAMM Certificate. Asbestos abatement of the existing Caryl Community Center building at 4 Springdale Avenue, Dover. Building demolition of approximately 2/3 of the existing building. Gut-reno of the existing to remain building portion and two additions constructed to it with a total building gross square footage of approximately 20,000 GSF. All new utilities, new stormwater drainage system, new parking, new pedestrian and vehicular paths and new landscaping.

Details

Clubhouse/Social Club, 20,000 SF Addition.
Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents