Similar Projects
Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Beverage Park - Manna Capital Partners Manufacturing Facility
New Construction, Infrastructure - 1,700,000 SF
Conception
$600,000,000 CJ est. value
Montgomery, AL 36104

Home 2 Suites / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Home 2 Suites / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

A New Alabama Statehouse Phase 1 Pre-foundation / Sitework
Demolition, New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Montgomery, AL 36104

Arby's / Montgomery
New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Montgomery, AL 36117

RFQ D/B - West Alabama Highway Design -Build Project
Infrastructure
Post-Bid
$775,000,000 CJ est. value
Montgomery, AL 36104

Renovation of Communications Building 1109
Infrastructure, Renovation
Results
$1,969,600 CJ est. value
Montgomery, AL 36108

Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31)
Infrastructure
Results
$2,499,649 CJ est. value
Montgomery, AL 36108

New Recreation Center - City of Montgomery
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Montgomery, AL 36104

Motley Drive Townhouse
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Montgomery, AL 36110

AutoZone #5525 / Montgomery
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Montgomery, AL 36117

Parkerson Mill Creek Greenway Phase III Lem Morrison Drive to Via College of Osteopathic Medicine (VCOM) Pond
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Montgomery, AL 36104

Planing, Resurfacing, Safety Improvements (Bridge Rail Retrofit and Guardrail Installation), and Traffic Stripe on SR-152
Infrastructure
Results
$4,730,720 CJ est. value
Montgomery, AL 36110

Hyundai Mobis Motor EV Battery Manufacturing Plant
New Construction, Infrastructure - 450,000 SF
Pending Verification
$205,000,000 CJ est. value
Montgomery, AL 36105

Last Updated 10/02/2023 09:07 AM
Project Title

Residence Inn By Marriott / Montgomery

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36117   (Montgomery County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New hotel. As of October 2, 2023, this project is in design. The architect and general contractor have been identified. A firm construction timeline has not been established; however, construction could begin Q1 2024.

Details

4 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents