Similar Projects
Section/Corridor Improvements - SC 146 - S-183 (Roper Mountain Rd) to S-654 (Bagwell Rd)
Alteration
Conception
$1,600,000 est. value
Taylors, SC

Beattie Plant Sewer Extension
Infrastructure
Bidding
$300,000 est. value
Fountain Inn, SC 29644

Cleveland Connector - Traxler Trail
Infrastructure
Bidding
$200,000 est. value
Greenville, SC

Brake Lane and Slope Hill
Infrastructure
Post-Bid
Greenville, SC

Brake Lane and Slope Hill
Infrastructure
Post-Bid
Greenville, SC

Safety Improvements at S-279
Results
SC

Safety Improvement at S-279
Infrastructure
Results
SC

Travelers Rest Downtown Overlay
Infrastructure
Post-Bid
Travelers Rest, SC

GA Development Area-Phase 1A Paving
Alteration
Results
Greer, SC

Waverly Hall Drainage Improvements
Infrastructure
Post-Bid
Simpsonville, SC 29681

Safety Improvements - Spartanburg/Greenville County
Infrastructure
Results

Augusta Street Streetscape Phase 1 - Road Diet Restriping
Infrastructure
Post-Bid
Greenville, SC 29613

Downtown Bollard Project
Alteration
Results
Greer, SC

Municipal Match Resurfacing Program and GLDTC 596 Resurfacing
Infrastructure
Post-Bid
$9,000,000 to $11,000,000 est. value
Greenville, SC

Greenville Legislative Delegation Transportation Committee MMRP FY 21/22 - 588.02
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
Fountain Inn, SC

Last Updated 07/04/2022 01:40 AM
Project Title

Culvert Installation and Road Paving at Century Park

Physical Address View project details and contacts
City, State (County) Greer, SC 29650   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1) Excavate under the concrete path (sidewalk) and existing roadway, and install ADS HP polypropylene storm pipe. (There is existing pipe under the sidewalk but is currently insufficient to handle the amount of runoff coming from the upper level of the park.) 2) Back fill and compact per manufactures specifications. 3) Prep and blacktop approximately 400 feet of existing road. 4) Seal and coat the remaining lot above the drive and any portion of the road not replaced.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents