Similar Projects
Pot Creek Lop and Scatter
Bidding
UT

1970 South 1200 West Street Construction Project
Bidding
Woods Cross, UT 84087

Antelope Flat Lop and Scatter
Post-Bid
UT

Miller Creek Lop and Scatter
Term Contract
Post-Bid
Salt Lake City, UT 84114

Castle Valley Lop and Scatter
Term Contract
Results
$50,000 to $60,000 est. value
Salt Lake City, UT 84114

Lower Hickman Canyon Bullhog
Term Contract
Results
Less than $213,798 est. value
Salt Lake City, UT 84114

Upper Horse Hollow Phase 2 Bullhog
Post-Bid
Less than $100,000 est. value
UT

Broad Hollow Bullhog
Results
Less than $300,000 est. value
Glendale, UT 84729

Yellow Jacket (Coral Pink) Bullhog
Post-Bid
$150,000 to $200,000 est. value
UT

Southern Utah December 2019 Aerial Seeding
Results
$50,000 to $60,000 est. value
Salt Lake City, UT

Pinto Bullhog
Term Contract
Post-Bid
Cedar City, UT

South Canyon Sevier River Bullhog
Results
Hatch, UT 84735

South Bookcliffs Nash Lop and Scatter
Post-Bid
Moab, UT

2020 Spring Tree Planting
Results
West Jordan, UT

Kanarra Ridge Far East Mechanical Fuels Reduction
Post-Bid
New Harmony, UT

Last Updated 06/18/2020 10:55 AM
Project Title

Red Ryder Piling

Physical Address View project details and contacts
City, State (County) Hyrum, Laketown, Randolph, UT 84038 (Cache, Rich Counties)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The majority of the project is located approximately 8 miles west of Laketown, UT and accessed by public roads. There are 9 separate units ranging in size from 4 to 90 acres. Access is via a narrow, unimproved road suitable only for high profile 4x4 vehicles. The project area entails very steep, rugged areas with up to 40% slopes. The general work location is shown on the attached map and kml and shapefiles are available. Elevations range from 7,300-8,400 feet within the project site. Project contains numerous cutting sites that will be accessed from varying locations and access points. The nearest towns are Laketown, Randolph, and Hyrum, UT. Property ownership is on federal lands, all of which are accessible from public roads.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents