Similar Projects
Reported | 05/21/2022 12:00 AM |
Project Title | B6940 Hanger Repairs Fort Hood |
Physical Address | View project details and contacts |
City, State (County) | Jbsa Lackland, TX 78236 (Bexar County) |
Category(s) | Transportation |
Sub-Category(s) | Aircraft Hangar |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Accepting Qualifications, Construction Start Expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design-Build repair of B6940 Hanger at Fort Hood, TX. The Renovation of Building 6940 project consists of an existing building that will be partially altered and remodeled under this SOW. Existing Building 6940 has an approximate overall area of 64,000 square feet based on as-built drawings. The building has an approximate 35,000 square foot (SF) two story office area with an additional 29,000 SF hangar area. The structure is a steel framed building with main trusses at 20’ on center. The main hanger portion is single slope frame with a 37’–0” eave height while the administration portion is a 34’–0” eave height two structure single slope roof that ties on to the hangar and also has a lower 17’-9” lean to, one story shop area. The project is located in the Airfield zone off of Murphy Loop in the North East area of Fort Hood. Building 6940 is a hangar with shops and office space. It is a steel frame metal two story building with slab on grade foundation with piers at the columns. The interior spaces are interior shops and administration spaces constructed of CMU walls and a hangar where aircraft maintenance is performed. The building envelope is metal siding with batt-insulation. The roof is a membrane roof over a built-up roof with access via exterior roof ladder and two interior roof hatches. The admin portion of the hangar is two-story, accessible from four staircases, two interior and two exterior. The facility requires general repair and renovations. The entire facility will need HVAC installation. |
||||||||||||||||||||
Details | Aircraft Hangar, Renovation, Aircraft Hangar, 64,000 SF Renovation.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |