Similar Projects
HVAC and Electrical Upgrades
Alteration
Bidding
$1,200,000 est. value
Bradley, IL 60915

HVAC and Electrical Upgrades
Alteration
Bidding
$1,200,000 est. value
Bradley, IL 60915

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Disaster Recovery Services
Results

Manteno Elementary School Chiller Replacement
Results
Manteno, IL 60950

DHS SP - FY22 Replace Condensing Unit and Refrigeration Coils - Shapiro
Alteration
Bidding
Kankakee, IL 60901

HVAC and Mechanical Products
Term Contract
Post-Bid

Accessibility and Miscellaneous Work at Mille Proegler School
Results
Kankakee, IL 60901

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

2021 Remodeling and Addition at Kankakee High School
Renovation, Addition
Results
Kankakee, IL 60901

Weatherization (IHWAP) Program
Term Contract
Post-Bid

IVHM FY21 Boiler Exhaust Replacement
Results
Manteno, IL

Kankakee Junior High School 2022
Renovation, Addition
Post-Bid
Kankakee, IL 60901

Upgrade Steam And Condensate Lines
Results
Less than $15,000,000 est. value
Kankakee, IL

Reported 12/02/2021 12:00 AM
Project Title

Mechanical Replacement Work at Multiple Middle Schools

Physical Address View project details and contacts
City, State (County) Kankakee, IL 60901   (Kankakee County)
Category(s) Education, Single Trades
Sub-Category(s) HVAC, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall take place at Kennedy Middle School, King Middle School and Kankakee Junior High School. The work includes, but is not limited to, removal of a portion of the existing steam heating systems and installation of new HVAC system at both schools. Also included is installation of new boilers and hot water heaters in a new Boiler Room at King Middle School and replacement of a roof top unit at Kankakee Junior High School.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents