Similar Projects
PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
Less than $5,368,000 est. value
Gurnee, IL

Locust Street CSO Elimination and Water Main Replacement - Phase 4+5 Construction - City of Bloomington
Infrastructure
Design
$2,190,000 est. value
Bloomington, IL 61701

Wastewater Collection System Improvements 2022
Infrastructure
Bidding
$2,450,000 est. value
East Dubuque, IL

2022 Manhole Rehabilitation Project
Infrastructure
Bidding
$280,000 est. value
Decatur, IL

2021 Sanitary Transmission Sewer Lining Program
Post-Bid
Lake Zurich, IL

Sanitary Sewer Relocation
Post-Bid
Bradley, IL

Sanitary Sewer System Improvements Contract A
Results
Tilton, IL 61833

GPSD Sewer Rehabilitation; Erosion Control, Project 2
Results
Less than $1,400,000 est. value
Peoria, IL 61600

IDOC - Tay Grease Removal Services
Infrastructure
Bidding
Owaneco, IL 62555

2021 Sanitary Sewer Televising
Post-Bid
Westmont, IL

Sanitary Sewer Rehabilitation Phase I
Results
Mascoutah, IL

51 Inch Main Interceptor Sewer Cleaning
Infrastructure
Bidding
$70,000 est. value
Bloomington, IL

2021 Polk Avenue Roadway and Utility Improvement
Post-Bid
Carpentersville, IL

2021 Sanitary Sewer System Rehabilitation
Results
Less than $198,925 est. value
Frankfort, IL

2021 Sanitary Sewer Cleaning and Televising
Term Contract
Post-Bid
Indian Head Park, IL

Last Updated 07/11/2022 07:03 AM
Project Title

Sanitary Sewer Main Lining

Physical Address View project details and contacts
City, State (County) Troy, IL   (Madison County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $301,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work (Base Bid) Cleaning-item 1 1. Sewers shall be cleaned following accepted industry standards removing sediment, sludge, rocks, debris and grease. 2. Debris shall be disposed of at a site designated by the City Inspection-item 2 1. Contractor shall inspect each sewer main via CCTV prior to lining to detect laterals, defects, roots or protruding taps that shall be corrected prior to lining installation ewer Main Lining- item 3 1. The contractor shall furnish and install 1,159 ft. +/-, Cured-in-Place Pipe (CIPP) in accordance with the specifications in the document

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents