Similar Projects
Alameda De Las Pulgas Landslide Repair
Infrastructure
Bidding
$340,000 to $350,000 est. value
San Carlos, CA

PW Pedestrian Safety Improvements
Infrastructure
Bidding
$900,000 est. value
San Francisco, CA 94158

Compost Leachate Pond Improvements
Renovation
Post-Bid
$1,900,000 est. value
Auburn, CA 95603

County Roadway Drainage Improvement Project
Infrastructure
Post-Bid
CA

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Citywide Flood Protection Maintenance
Infrastructure
Bidding
Paso Robles, CA

Outfall Channel and Instrumentation Improvements
Infrastructure
Post-Bid
$4,500,001 to $4,750,000 est. value
San Jose, CA 95134

Paving Of Residential And Major Streets Rehabilitation Project
Infrastructure
Bidding
$1,500,000 est. value
Baldwin Park, CA 91797

Upper Mormon Slough Critical Erosion Repair
Infrastructure
Post-Bid
$5,387,900 to $6,136,214 est. value
Escalon, CA 95320

Bridge Seismic Retrofit and Rock Slope Protection
New Construction, Infrastructure
Bidding
$8,100,000 est. value
CA

Install Rockfall Drapery Systems & roadway excavation.
Infrastructure
Post-Bid
$8,000,000 est. value

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Bidding
$16,200,000 est. value
CA

Roadway Excavation, HMA (Type A), Culvert Work and RSP
Infrastructure
Bidding
$4,860,000 est. value
CA

Replace Drainage Pumps
Infrastructure
Bidding
$6,400,000 est. value

Reported 08/17/2021 12:00 AM
Project Title

Levee Maintenance Project

Physical Address View project details and contacts
City, State (County) Stockton, CA 95214   (San Joaquin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The furnishing of all bonds, labor, materials, materials certification, equipment, supplies, necessary tools, apparatus, facilities and incidentals necessary to perform the following work on the levee areas of Brookside Estates, Stockton, California including. a) Remove and dispose of vegetation associated with the installation of project materials. b) Trim and dispose of tree branches c) Construct levee slope slough repair. d) Construct levee slope washout repair. e) Remove existing levee signs. f) Paint and service swing gates and turnstiles. g) Construction minor fence improvements. h) Construct levee rodent burrow repair. i) Place gravel erosion control materials. j) Place rip rap slope protection materials. k) Install temporary erosion protection. l) Site cleanup - remove all debris and excess materials from the site.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents