Similar Projects
Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$1,892,000 CJ est. value
Chadds Ford, PA 19317

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,314,000 CJ est. value
Upper Darby, PA 19082

State Rd o/Darby Creek
Infrastructure, Renovation
Design
$9,294,250 CJ est. value
Media, PA 19063

RFQ Construction Manager at Risk - Miscellaneous Campus Projects
New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Elwyn, PA 19063

Replacement Belts for a Belt Filter Press/gravity Belt Thickeners
Infrastructure
Bidding
$49,610 CJ est. value
Chester Township, PA 19013

T-28 Construction and PS-5 Modifications
Renovation
Post-Bid
Chester, PA

Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Darby, PA 19023

New Borough Administration, Police and Community Center - All Site Work
New Construction
Results
Trainer, PA 19061

Site Projects at the Sharon Hill Campus
Results
Sharon Hill, PA 19079

Villanova University - St Mary`s Hall Gymnasium Pool Infill
Construction
Villanova, PA 19085

Estates at Coventry Woods Phase 2A
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Springfield, PA 19064

155 Radnor Office
New Construction, Infrastructure - 145,000 SF
Pending Verification
$31,000,000 CJ est. value
Wayne, PA 19087

Station Rd Bridge / Chester #234
Demolition, New Construction, Infrastructure
Conception
$3,372,000 CJ est. value
Media, PA 19063

Folcroft Avenue O/AMTRAK
Demolition, Infrastructure
Design
$2,725,000 CJ est. value
Media, PA 19063

Last Updated 10/27/2022 07:35 AM
Project Title

Influent Wet Well Rehabilitation - City of St. Petersburg

Physical Address View project details and contacts
City, State (County) Elwyn, PA 19063   (Delaware County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Influent Wet Well Rehabilitation A detailed scope has not yet been determined This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of October 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents