Similar Projects
PHS Stack Demo and Boiler Replacement
Demolition, Alteration
Bidding
Parkersburg, WV 26101

HVAC Units for Grant County HQ and Breakroom 05210364
Alteration
Bidding
Petersburg, WV 26847

AC Repair Clarksburg, WV
Post-Bid
Clarksburg, WV

Chiller Rebuild - WV Visiting Nurse Facility
Post-Bid
Clarksburg, WV

Touchdown Terrace Chiller Replacement
Results
Morgantown, WV 26506

Heating, Ventilation and Air Conditioning Services (HVAC)
Term Contract
Results
Shepherdstown, WV 25443

Building 1 Room M146 Office HVAC Units
Alteration
Bidding
Charles Town, WV

Centrifugal Chiller Repair and Maintenance Services
Post-Bid
Clarksburg, WV

Replacement of AHU's 5 and 6 at CAC
Results
Morgantown, WV 26506

Tygart Lake State Park - Lodge HVAC Replacement
Alteration
Bidding
Grafton, WV 26354

Chiller and HVAC Full Service Comprehensive Contract - Joan C. Edwards School of Medicine
Post-Bid
Chapmanville, Huntington, WV

HVAC Maintenance - Veterans Nursing Facility
Term Contract
Results
$30,239 est. value
Clarksburg, WV 26304

Building 5 DA Tank and Elevator Cooling Unit Repairs
Alteration
Bidding
Charleston, WV

Chiller Maintenance and Repair Services - Physical Plant Comprehensive Chiller Maintenance and Repair Services
Post-Bid
Huntington, WV 25755

Vandalia HVAC Replacement Work
Results
Morgantown, WV 26506

Last Updated 06/22/2021 12:50 PM
Project Title

Boiler Repairs - Salem Correctional Center and Jail

Physical Address View project details and contacts
City, State (County) WV   (Harrison County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $170,060
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

At Salem Correctional Center and Jail, there are two (2) existing Bryan natural gas fired boilers, B1 and B2. The two (2) boilers are in room AM196B on the mezzanine floor. The only access is via the stairwell. The two (2) boilers are used to heat the building. The two (2) boilers were built in 1999. It only takes one (1) boiler to heat the building. They have a redundant heating system. There is one (1) boiler that is not operational currently, B1, and the other is operational, B2. The contractor must rebuild the two (2) boilers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents