Similar Projects
Health Center - California State University - Stanislaus
New Construction, Infrastructure - 15,600 SF
Conception
$27,773,000 CJ est. value
Turlock, CA 95382

Classroom Building II - California State University - Stanislaus
New Construction, Infrastructure - 75,189 SF
Conception
$80,426,000 CJ est. value
Turlock, CA 95382

Moffett Road / Multi-Residential
New Construction, Infrastructure - 24,500 SF
Design
$10,900,000 CJ est. value
Ceres, CA 95307

Sun Valley Commercial Buildings / Patterson
New Construction, Infrastructure - 8,000 SF
Design
$1,900,000 CJ est. value
Patterson, CA 95363

RFQ D / B - ASH Residence Life Village IV
New Construction, Infrastructure - 46,000 SF
Bidding
$18,210,000 CJ est. value
Turlock, CA 95382

SR99 at Standiford Avenue and SR99 at Briggsmore Avenue Interchanges Projects
Infrastructure
Post-Bid
$12,940,000 CJ est. value
Modesto, CA 95354

RFP - 2022 Water Master Plan
Term Contract
Post-Bid
Turlock, CA 95380

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Water and Sewer Main Extensions - Golden State Boulevard
Infrastructure
Results
$2,300,000 est. value
Turlock, CA 95382

Lease-Leaseback Construction Services (John Fremont Elementary School Cafeteria and Site Improvement Project) - Modesto City Schools
Renovation, Infrastructure
Construction
$9,200,000 CJ est. value
Modesto, CA 95350

Senior Playground 2014 - 100866 - City of Modesto
Infrastructure, Renovation
Construction
$957,105 CJ est. value
Modesto, CA 95354

Park Villas / Turlock
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Turlock, CA 95382

Cherry Hollow / Ceres
New Construction, Infrastructure
Pending Verification
$7,500,000 CJ est. value
Ceres, CA 95307

Student Fitness Center - Addition - California State University - Stanislaus
Addition, Infrastructure - 30,000 SF
Conception
$74,921,000 CJ est. value
Turlock, CA 95382

Replace Safety Roadside Rest Area
Infrastructure
Design
$8,284,000 CJ est. value
Westley, CA 95363

Last Updated 10/18/2023 08:03 PM
Project Title

Groundwater Recharge Station Project

Physical Address View project details and contacts
City, State (County) Turlock, CA 95382   (Stanislaus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,750,000 [brand] Estimate
Plans Available from Copy Center - 09/14/23
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of modifications to the existing lawn area, as delineated on the project drawing set. Demolition includes excavation and removal of the existing landscaping, tree(s), irrigation, and subgrade to accommodate a groundwater recharge basin. New work includes installation of a pump system consisting of three pumps within a fenced enclosure with privacy slats. The pump system shall be connected to the existing Warriors Pond discharge pipe with the option to bypass the proposed pump system. All new controls shall be connected to the existing system for control and monitoring by central plant facility staff. All questions are due in writing on Monday, October 9, 2023, by 5:00 PM. In general, the work consists of demolition, including excavation and removal of existing landscape, to accommodate a groundwater recharge basin and installation of pump system that shall be connect to existing discharge pipe with bypass option. The Trustees require the successful bidder to achieve three percent (3%) DVBE participation in contracting construction projects as established in the bidding documents, and biddersshall identify the DVBEs to be used to satisfy this requirement in their bids. The University is granting a bid incentive up to 3% as described in the Contract General Conditions, Section 2.13 (3) g. Bidders shall contact Rhonda Willson at rwillson@csustan.edu or (209) 667-3730. It will be the responsibility of each bidder to obtain a bid proposal package in sufficient time to fulfill requirements therein. Bid proposal packages are obtainable only by prequalified contractors, licensed in the State of California with an A or B license, and registered with the DIR to bid public works projects. The bid packages must be requested from the Trustees, located at CSU Stanislaus, One University Circle, Turlock, CA 95382; Attention: Rhonda Willson, (209) 667-3730 or via email at rwillson@csustan.edu . The campus construction budget estimate is $1,750,000.00. Direct All Technical Questions to: Tim Overgaauw, Sr. Director, Facilities Operations and Construction California State University, Stanislaus One University Circle Turlock, CA 95382 Ph: (209) 664-6626 or tovergaauw@csustan.edu

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents