Similar Projects
Plumbing Fixtures Installed
Term Contract
Design
Vicksburg, MS 39183

District Four Bottle Filler Replacement Project
Alteration
Post-Bid
$300,000 est. value
Hernando, MS

Plumbing and Mechanical Services
Alteration
Post-Bid
University, MS

Wastewater Lagoon Erosion Repairs
Infrastructure
Results
$1,071,350 CJ est. value
Philadelphia, MS 39350

2022 Wastewater Improvement Project
Infrastructure
Results
$206,932 CJ est. value
Duncan, MS 38740

Gulfport Hidrostal Pump
Renovation
Post-Bid
$120,000 CJ est. value
Gulfport, MS 39501

Hunters Ridge Sewer Slope Stabilization and Sewer Repair
Infrastructure
Results
$286,720 CJ est. value
Clinton, MS 39056

Natural Gas Meter Change Outs
Alteration
Post-Bid
$50,000 est. value
Pontotoc, MS

Loyd Star Attendance Center New Football and Soccer Complex
New Construction, Infrastructure
Results
$3,541,739 CJ est. value
Wesson, MS 39191

Emergency Watershed Protection 5 Various Sites
Infrastructure
Post-Bid
$600,000 CJ est. value
Horn Lake, MS 38637

Main Street and Lampkin Street Water Main and Sanitary Sewer Improvements
Infrastructure
Results
$2,461,000 CJ est. value
Starkville, MS 39759

Topisaw Creek Bank Stabilization
Infrastructure
Post-Bid
$240,713 CJ est. value
Jayess, MS 39641

Creek Crossing & Sewer Improvements
Infrastructure
Results
$359,897 CJ est. value
Water Valley, MS 38965

Mississippi Water System Improvements Contract A - Meter Materials Contact
Term Contract
Post-Bid
$150,000 CJ est. value
Booneville, MS 38829

Highway 15 Utility Relocation
Infrastructure
Results
$158,427 CJ est. value
Blue Mountain, MS 38610

Last Updated 10/04/2023 12:41 PM
Project Title

Piney Woods Infrastructure DRA Improvements - Wastewater

Physical Address View project details and contacts
City, State (County) Braxton, MS 39044   (Simpson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $448,085 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of wastewater lagoon, pump station, and related items. The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. Contract time shall be 180 consecutive calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed in the amount of the actual costs incurred for each consecutive calendar day beyond the specified contract time. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent of his bid, payable to the Piney Woods School, Piney Woods, MS as bid security. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of 100 percent of the contract amount.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents