Similar Projects
Howard Family Trail Bridge Repair 2022
Infrastructure
Bidding
$400,000 CJ est. value
Saint Joseph, MI 49085

Howard Family Trail Bridge Repair 2022
Infrastructure
Bidding
$400,000 CJ est. value
Saint Joseph, MI 49085

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

E Napier Avenue & Dewey Avenue 400' West of S. Euclid Ave. to Dewey Ave. and Dewey Ave. from Napier Ave. to 1,700' South
Results
Benton Harbor, MI

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

Creek Drive Water Main Replacement
Infrastructure
Bidding
Michiana, MI 49117

2021 Michigan Street Reconstruction Project
Infrastructure
Post-Bid
Three Oaks, MI 49128

Colfax Avenue & Messner Drive, Napier Avenue to Eloise Drive
Results
Benton Harbor, MI

Hot Mix Asphalt Surface Reconstruction, Concrete Curb, Gutter, Sidewalk and Ramps, Guardrail and Pavement Markings on Riverside Drive/Paw Paw Avenue
Infrastructure
Bidding
$713,000 CJ est. value
Watervliet, MI 49098

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

1.51 MI of Hot Mix Asphalt Overlay, Trenching Widening
Results
MI

Shorewood Hills HOA - Pavement Improvements
Renovation
Post-Bid
Sawyer, MI 49125

2.01 MI of Hot Mix Asphalt Cold Milling and Resurfacing
Results
MI

Last Updated 09/21/2022 04:34 PM
Project Title

2022 Inflow and Infiltration Removal Pilot Project

Physical Address View project details and contacts
City, State (County) Saint Joseph, MI 49085   (Berrien County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $699,362 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

THIS PROJECT IS BEING REBID. The Project includes repair and rehabilitation of wastewater sewers and manholes, and related surface improvements. Substantial Completion of sewer items no later than 02/17/2023. Roadway, paving, and restoration items complete no later than 05/19/2023. PROJECT ESTIMATE: $699,361.50 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Questions to: Abonmarche Consultants, Inc. attn.: Daniel Dombos, PE: ddombos@abonmarche.com Questions must be entitled: "COSJ: Ravine Interceptor I&I Removal - RFI

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents