Similar Projects
University of Missouri Indoor Football Practice Facility
New Construction
Conception
Columbia, MO 65211

Old Dominion Freight Line Warehouse Expansion
Addition - 23,554 SF
Conception
Saint Charles, MO 63301

Self-Storage Facility
New Construction - 6,000 SF
Design
Springfield, MO 65810

Chesterfield Sports Complex
New Construction - 98,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chesterfield, MO 63005

Richwoods Restrooms
Renovation
Bidding
Richwoods, MO 63071

Roof Top Unit Replacements
Renovation, Alteration
Bidding
Liberty, MO

Christian Ott Elementary Secure Entry Remodel
Renovation - 2,500 SF
Sub-Bidding
Independence, MO 64050

Youth Ballfield Complex
New Construction
Post-Bid
$4,250,000 est. value
Cape Girardeau, MO

Fulton 58 School District-Secure Vestibule Upgrades
Renovation
Post-Bid
Fulton, MO 65251

Mark Twain Elementary Gym-Music safe Room and Eugene Elementary Gym-Music safe Room
Addition
Results
Springfield, MO 65807

Salt Shed Floodproofing
Results
Ferguson, MO 63135

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

EchoPark Conversion - St Louis
New Construction, Renovation - 57,569 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Chesterfield, MO 63005

Amazon Sort Center
New Construction
Pending Verification
Berkeley, MO 63134

KKJ Wholesale Manufacturing & Warehouse
New Construction
Pending Verification
Springfield, MO 65802

Last Updated 03/02/2022 11:50 AM
Project Title

Freedom Elementary FEMA Saferoom Building Addition

Physical Address View project details and contacts
City, State (County) Saint Robert, MO 65584   (Pulaski County)
Category(s) Commercial, Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Elementary School, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a 9,056 square foot precast concrete ICC 500 FEMA P-361 rated Safe Room to contain a gymnasium area with associated storage, mechanical, and restrooms and a 550 square foot non-FEMA connector. Site work will include the development of the site, sidewalks, and supporting site utilities.

Details

Elementary School, 9,056 SF Addition, Athletic Facility, Addition, Warehouse/Storage, Addition.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents