Similar Projects
2022 East Pearl Sidewalk Project
Infrastructure
Post-Bid
Jackson, WY

Phase IA 3rd Street Diamond to Main Street and Utility Improvement Project
Infrastructure
Bidding
$200,000 est. value
Lusk, WY 82225

Laramie Streets (3rd St. and Flint St.)
Infrastructure
Bidding
$200,000 est. value
Laramie, WY 82072

Industrial Avenue Drainage and Surfacing Improvement - Elm Street to David Street
Infrastructure
Post-Bid
$550,000 est. value
Casper, WY

Entrance Road and Parking Area Improvement Project
Infrastructure
Post-Bid
Saratoga, WY 82331

2022 Cody Sidewalk and Pedestrian Ramp Improvements
Infrastructure
Bidding
$340,000 est. value
Cody, WY

Pine Bluffs Reher Park Playground
Renovation, Alteration
Post-Bid
Pine Bluffs, WY 82082

Byron Streets (US 14A)
Infrastructure
Results
Sheridan, WY

Miller Park Pedestrian Sidewalk and ADA Improvements Project
Infrastructure
Post-Bid
Jackson, WY 83001

Kaycee Library ADA Compliance Project
Infrastructure
Post-Bid
$257,000 est. value
Kaycee, WY 82639

District 1 Contract Patching
Infrastructure
Bidding
$200,000 est. value
Cheyenne, WY 82009

Reported 04/13/2022 12:00 AM
Project Title

Gateway Park Pathway Project

Physical Address View project details and contacts
City, State (County) Sheridan, WY   (Sheridan County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Concrete Walkway, Walkway/Passage/Corridor Description: All work and materials for upgrading approximately 6,800 feet of existing gravel (soft) pathway to concrete, multi-use pathway. Improvements will include excavating, subbase compaction and forming and pouring the concrete pathway sections. Pathway section under a set of Interstate 90 (I-90) overpasses spanning Goose Creek will require installation of gabion wall, soil nail installation and application of shotcrete for stability of the slope above the pathway. Connections to existing pathways and the proposed Gateway Park Pedestrian Bridge constructed under a separate contract will also be part of the project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents