Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District
Infrastructure
Conception
$245,000 est. value
Boise, ID 83704

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Post-Bid
$4,181,379 CJ est. value
Boise, ID 83706

RFQ Design - Architects-Engineers Services - Student Residence Hall, Boise State University
New Construction, Infrastructure
Post-Bid
$5,500,000 CJ est. value
Boise, ID 83725

FY22 D3 Bridge Repair
Renovation, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
Boise, ID 83716

Bull Meadow Sage-Grouse Habitat Improvement
Infrastructure
Results
$400,000 est. value
Boise, ID

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Peak at Sawtooth Village
New Construction, Infrastructure - 4,846 SF
Design
$1,400,000 CJ est. value
Meridian, ID 83646

Boise High Track Replacement Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Boise, ID 83702

Last Updated 10/16/2023 08:04 AM
Project Title

Spring Valley Roadway Phase 3

Physical Address View project details and contacts
City, State (County) Eagle, ID 83616   (Ada County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Spring Valley Roadway Phase 3 Site Directions: Located at the Spring Valley Development, a master planned development in Eagle, Idaho. The project is located east of State Highway 16 and generally extends to the east off highway 16 to the Big Gulch Creek valley. Located at the Spring Valley Development, a master planned development in Eagle, Idaho. The project is located east of State Highway 16 and generally extends to the east off highway 16 to the Big Gulch Creek valley. Major components of the project are summarized below. o Big Gulch Parkway & Linder Roadway Improvements Approximately 4,200 linear feet. o Big Gulch Parkway Subbase Material Improvement Approximately 6,000 linear feet. o Two Lane Roundabout o Three Bridge installations with Abutments.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents