Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

PCC Sidewalk/Trail
Infrastructure
Bidding
IA

2021 Cowles Drive Reconstruction - Phase 2 and 3
Infrastructure
Bidding
$12,500,000 est. value
Des Moines, IA 50321

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

C Ave Manhole Replacement
Infrastructure
Bidding
Cedar Rapids, IA 52497

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Post-Bid
$17,655,000 est. value
Burlington, IA

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Last Updated 12/09/2021 09:12 AM
Project Title

South 8th Street Sewer Separation

Physical Address View project details and contacts
City, State (County) Clinton, IA 52732   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,014,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of 4108 square yards of 7" PCC pavement with 12" aggregate base, 229 tons of asphalt paving; 1903 square yards of 2" milling, 698 linear foot of 30" curb and gutter; 3186 square foot of 5" PCC sidewalk, 23 storm sewer inlets, 5 storm sewer manholes, 2075 linear foot of various size storm sewer, 20 linear foot of sanitary sewer, 6172 square yards of full depth pavement removal, 2024 cubic yards of earthwork, seeding, sidewalk removals, driveway work, erosion control items, and other associated construction items.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents