Similar Projects
The Davis Community
New Construction - 211,475 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28411

Olive Branch Road Development
New Construction
Conception
Durham, NC

The Woodlands At Echo Farms Tract 3C
New Construction - 113,007 SF
Design
$10,000,000 CJ est. value
Wilmington, NC 28412

Walter Tower
New Construction - 315,000 SF
Design
Raleigh, NC 27609

Burlington Road Townhome Development
New Construction - 39,600 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Gibsonville, NC 27249

Kingsley Park
New Construction
Post-Bid
Fayetteville, NC

Parkwood West
New Construction
Post-Bid
Fayetteville, NC

319 Biltmore
Results
Asheville, NC 28802

Renovation of Developments NC19P077001 and NC19P077002
Renovation
Results
Less than $320,000 est. value
Williamston, NC

Vermillion Village
New Construction - 10,000 SF
Construction
Huntersville, NC 28078

The Terraces
New Construction, Addition
Construction
Charlotte, NC 28210

Sea Glass Harbour
New Construction
Pending Verification
Wilmington, NC 28412

Timber Farms
New Construction
Pending Verification
Ocean Isle Beach, NC 28469

Spring Ridge Townhomes
New Construction
Conception
Wilmington, NC

Multifamily Project
New Construction - 28,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27127

Reported 05/03/2022 02:38 PM
Project Title

801 New Bern

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method
Project Status Construction Commenced second quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

4 Multi-Family Homes, New Construction, 5 Units per Building.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents