Similar Projects
Reported | 03/23/2022 12:00 AM |
Project Title | DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC (District of Columbia County) |
Category(s) | Commercial |
Sub-Category(s) | Office |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $20,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description of Work Required: The Contractor will be responsible for all labor, materials, equipment, and project oversight (i.e., management and field supervision) to execute the project and contract requirements. Construction Services required include but are not limited to: Selective Demolition: 1. Flooring to structural slab 2. Ceiling tile finishes and existing doors Partitions Interior Construction: 1.Self-leveling cement-based flooring, 2.Partitions 3. Flooring/Walls/Ceilings/Paint 4. Interior Doors/Finishes 5. Wood treatment 6. Interior all-glass storefronts and signage 7. Acoustical panels and finishes Plumbing 1. New mechanical equipment. 2. Sleeves, controls, and Seals for Fire-Suppression Piping and Equipment 3. General plumbing, such as drainage, cleanouts, valves, piping, fittings 4. Plumbing – Sanitation lines and new plumbing for bathrooms. Mechanical: 1. New mechanical equipment. 2. HVAC –new systems: a. HVAC Distribution ductwork, chilled beams, outlets, hydronic piping, VAV, FCU, insulation, etc. b. Installation of new HVAC Equipment c. Modifications to the HVAC controls. d. Testing & balancing. 3. Fire Protection –relocating and adjusting the sprinkler heads. Electrical: 1. General . 2. Security Requirements – 3. Electrical and Grounding Distribution –electrical distribution modifications. 4. Receptacles & Branch Wiring –receptacles and misc. branch power in all the reprogramming areas. 5. Lighting & Lighting Controls –lighting and lighting controls in all the reprogramming areas. 6. Communications –telecom outlets rough-in, any equipment, racks, patch panels or switches. 7. Security Systems – modifications of the existing systems in the reprogramming areas. 8. Fire Alarm System - modifications to the existing fire alarm system. 9. Audio-Visual Rough-In Project Description: The DHS Operations Center (DOC A) Phase 2D includes several major construction elements relating to the remaining tenant fit-out of the DHS consolidated Operations Center facility (DHS Operations Center (DOC A) Phase 2D is currently finished with construction, but has some additional services needed, so it will be included in this proposal as a modification. The operations center building consists of two (2) stories below grade. Located adjacent to the United State Coast Guard Headquarters (USCG HQ - Munro Bldg.), the remaining tenant fit-out work will finish spaces designated for the DHS components and required to support the DHS mission at the St. Elizabeth’s campus. The St Elizabeths site is approximately 176 acres and is a National Historic Landmark (NHL) site containing primarily office space and parking structures with some special buildings for conferences and food service. The site, located one mile east of DC on Martin Luther King Boulevard, is the former St. Elizabeths Hospital site in Anacostia, Washington, DC. Three phases are planned in total, with a phasing summary as follows: Phase 1 – new construction for the U.S. Coast Guard Headquarters (USCG) (1,179,500 gsf) [awarded September 2009] Adaptive reuse of historic buildings for DHS at 179,250 gsf; Phase 2 – The Center Building for DHS, Central Utility Plant and DHS Operations Center, a mix of new construction and adaptive reuse projects along with FEMA Headquarters at 1.7 million gsf and Phase 3 – a combination adaptive reuse and new construction for Customs and Border Protection (CBP), Immigration and Customs Enforcement (ICE), Transportation Security Administration (TSA) and DHS (1,398,150 gsf). The contractor must provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise provided), and must plan, schedule, coordinate and assure effective performance of all final construction to meet General Services Administration (GSA) and client agency requirements. The GC will perform the construction in accordance with the design specifications, drawings, and the provisions and terms and conditions of the contract. |
||||||||||||||||||||||||||||||||||||
Details | 1 Office, 117,950 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |