Similar Projects
2021 LMIG Asphalt Resurfacing Project
Bidding
Holly Springs, GA

Traffic and Design Engineering Services for SR 140 at CR 309/Univeter Road Intersection Improvement
Bidding
Less than $4,487,000 est. value
Canton, GA 30115

T32-D6-Pavement Preservation-Bartow/Cherokee-96959
Post-Bid

Dual Turn at Ridge Walk Parkway and Main Street Intersection
Post-Bid
Woodstock, GA 30188

Southern Region Disaster Recovery Support BPA
Results

2019 LMIG Resurfacing Program
Results
Canton, GA 30114

Spout Springs ES Access Drive Modifications
Bidding
Flowery Branch, GA 30542

Routine Maintenance - D6
Post-Bid
Cartersville, Holly Springs, GA 30120

Asphalt Paving and Repair
Results
Acworth, GA 30101

2021 Resurfacing Project
Bidding
GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

T32-D6-PPV-Cherokee Edge Rut -100966
Results
GA

T32-D6-Ppv-Crack Seal-A1-115640
Post-Bid

2020 LMIG Asphalt Resurfacing Project
Results
Holly Springs, GA 30115

2021 LMIG Project
Post-Bid
Mount Vernon, GA

Last Updated 12/16/2019 04:18 PM
Project Title

Buckhead Crossing Dual Left Turn Lanes Project

Physical Address View project details and contacts
City, State (County) Woodstock, GA   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors for the purpose of creating dual left turn lanes for traffic exiting Buckhead Crossing turning onto Towne Lake Pkwy by relocating and extending the existing median. This project will consist of saw cutting and removing asphalt to install a new, extended median with 20 concrete curb and gutter (barrier), replanting the 4 median with 48 Dwarf Nandinas for new median as drawn conceptually, repairing the asphalt where the previous median was located, overlaying asphalt from Towne Lake Pkwy to Victoria Lane on Buckhead Crossing, and restriping 12 lanes within Buckhead Crossing along with left turn arrows, crosswalk, and striped lanes guiding turning traffic.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents