Similar Projects
Residential Resurfacing: Area bound by N Santa Fe Ave, N Kelley Ave, NW 50th St and NW 36th St - City of Oklahoma City
Infrastructure
Conception
$2,772,500 est. value
Oklahoma City, OK

Arterial Resurfacing: N May Avenue from NW 63rd St to W Wilshire Boulevard - City of Oklahoma City
Infrastructure
Conception
$1,335,000 est. value
Oklahoma City, OK 73195

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Electrical Construction Services at Mike Monroney Aeronautical Center
Alteration
Design
$500 to $1,000,000 est. value
Oklahoma City, OK 73169

Battery Backup Systems
Term Contract
Sub-Bidding
Oklahoma City, OK 73102

Traffic Control and Safety, Units, Parts, Supplies and Equipment
Term Contract
Sub-Bidding
Oklahoma City, OK 73102

Misc Electrical - PVC Pipe and Fittings
Alteration
Post-Bid
Edmond, OK

H959--Switchgear Maintenance (Okc) Provide 3Yr Switchgear PM On The Main Hospital
Term Contract
Post-Bid
Oklahoma City, OK 73104

Electrical Upgrades to the James D Couch Municipal Office Building 420 West Main
Alteration
Results
$276,250 est. value
OK 73102

B-52 Lab Conduit & Cable Installation
Term Contract
Results
Oklahoma City, OK 73145

6110--Automatic Transfer Switch Preventive Maintenance
Term Contract
Post-Bid
Oklahoma City, OK 73104

J061--Automatic Transfer Switch Maintenance
Alteration
Results
Oklahoma City, OK 73104

Minor to Major Electrical Repairs
Term Contract, Alteration
Post-Bid
Oklahoma City, OK

Uninterruptible Power Supply Preventive Maintenance
Term Contract
Results
Oklahoma City, OK 73104

Emergency Generator
Term Contract
Post-Bid
Oklahoma City, OK 73131

Last Updated 12/06/2022 01:45 PM
Project Title

Booster Pump Station Electrical Improvements, Booster Pump Station Nos. 11, 12, 15, 18, 19, 21, 22, and 23

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73102   (Oklahoma County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City of Oklahoma City has public improvement work that requires the professional services of a consulting firm ("Consultant"). In order to be considered, the Consultant must timely submit a Letter of Interest as provided herein and comply with the Resolution establishing procedure for "Selection of Architects, Engineers, and Planners" adopted by the City Council on November 18, 1986, a copy of which may be obtained at website. Project Title: Project WC-1039, Booster Pump Station Electrical Improvements, Booster Pump Station Nos. 11, 12, 15, 18, 19, 21, 22, and 23 Scope of Work: This project will upgrade the electrical systems needed for arc flash mitigation at the identified booster pump stations. The consultant will utilize the 2022 Assessment Report, 2018 Arc Flash/Short Circuit/Power Availability Study, and operator knowledge as part of the design process. The engineer will provide preliminary engineering. Final design, bidding, construction administration, construction inspection, and as-built services for the improvements may be by possible future amendment. The 2018 ARC Flash Summary and Field Investigation Evaluation Report can be obtained at website. Time Schedule for the above Scope of Work: Task 1 - Preliminary Report required within one hundred fifty (150) days of City/Trust approval of the Notice to Proceed. Letter of Interest must provide your understanding of the project and scope of services; your approach and concept; designation of your Project Team and their detailed expertise and experience on similar projects, and accessibility to City staff. The Consultant may not change the Project Team without prior consent of the City Engineer. Please provide a contact name and email address in your Letter of Interest. All contracts with the City or its related Trusts use this Contract. The Contract is located on website. Please review the Contract and particularly the insurance and indemnity requirements will be met. Contract terms are not negotiable. The City may negotiate Scope of Work, Compensation, and Additional Services. If the City or Trust determines, in its sole discretion, the City or Trust is not able to timely negotiate an acceptable Scope of Work, Compensation, and Additional Services with the selected Consultant, then the City or Trust may terminate such negotiations and commence negotiation with another Consultant.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents