Similar Projects
BISC 251091, Roofing Replacement and Pavilion Structure on the Department of Interior (DOI)
Alteration
Design
$400,000 est. value
Homestead, FL 33030

Roof Repair / Replacement at Palm Lake Village Apartments
Alteration
Post-Bid
Dunedin, FL 34698

Flat Roof Replacement for Various Miami Shores Village Buildings
Renovation
Post-Bid
$400,000 CJ est. value
Miami Shores, FL 33138

Remove and Replace Existing Roof at Miami Job Corps Center
Results
$500,000 to $1,000,000 est. value
Miami Gardens, FL 33056

Roof Replacement Building 7
Term Contract
Results
$500,000 to $1,000,000 est. value
Miami, FL 33125

Miami Springs Golf and Country Club Roof Repairs
Renovation, Alteration - 5,532 SF
Post-Bid
$200,000 est. value
Miami Springs, FL 33166

JFK Library-Reroofing
Alteration
Results
Hialeah, FL 33010

MDC Medical Campus Building 2000 Reroof
Alteration
Post-Bid
Miami, FL 33127

Roof Repair - Chalet Roof
Alteration
Results
Miami, FL 33132

Mayor's Office Exterior Rooftop Terrace - Exterior Rooftop Terrace Waterproofing
Renovation
Post-Bid
$10,340 CJ est. value
Hialeah, FL 33010

Construction Services for the Mdx Headquarters Roof Replacement
Renovation
Results
$470,056 CJ est. value
Miami, FL 33142

City Hall Mayor's Exterior Rooftop Terrace - Exterior Rooftop Terrace Selective Demolition and Tile
Alteration
Post-Bid
$20,000 est. value
Hialeah, FL 33010

Re-Roofing at Ashley Plaza
Renovation
Results
$227,972 CJ est. value
Hialeah, FL 33010

Donald Scott Villas Re-Roofing Phase 2
Renovation
Post-Bid
$80,000 CJ est. value
Hialeah, FL 33013

Roof Replacement for Guard Houses
Renovation
Results
$52,000 CJ est. value
Miami Lakes, FL 33014

Last Updated 06/01/2023 02:08 AM
Project Title

DSWM South Dade Landfill Facility Roofing Project - Roof Deck Waterproofing and Partial Roof Repairs

Physical Address View project details and contacts
City, State (County) Homestead, FL 33032   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $122,436 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work consists of all labor, materials, supervision, and related tasks for the Department of Solid Waste Management's South Dade Landfill Facility Roofing Project (Roof Deck Waterproofing and Partial Roof Repairs) as defined in the project's Summary of Work, Technical Specifications and Drawings. PRIME CONTRACTOR MUST BE ABLE TO PULL MASTER PERMIT. LICENSE QUALIFICATIONS OF CONTACTORS: A. All Contractors must hold a current valid State of Florida Certified Roofing Contractor License, as required by the Florida Building Code, for the types of Work covered by the Contract at the time of RPQ submission and maintain same throughout the duration of the project. The certificate(s) is to be issued by: The State of Florida Construction Industry Licensing Board, pursuant to the provisions of Section 489.115 of the Florida Statute and registered with the Miami-Dade County, Building Department or, The Dade County Construction Trades Qualifying Board, pursuant to the provisions of Section 10-3(a) of the County Code. Holders of Miami-Dade County Certificates of Competency must also hold Certificates of Registration issued by the State of Florida Construction Licensing Board, pursuant to the provisions of Section 489.115 or Section 489.117 of the Florida Statutes. B. Proof of such Certificate(s) must be submitted at the time of initial response and maintained current throughout the contract period. The County may request proof of continued certification at any time during the contract period. Failure to provide such proof within five (5) working days from notification by the County shall result in the removal from the contract and the rejection of any current or future RPQ bid submissions. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work. Calendar Days for Project Completion: 65 Performance & Payment Bond Required: NO Bid Bond Required: NO Prevailing Wage Rate Required: Davis Bacon wages Davis Bacon: YES Maintenance Wages: NO AIPP: NO Amount: SBE-Con. Requirements: NO Percentage: 0.00% SBD Certificate of Assurance Form Required: NO

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents