Similar Projects
Sheetz / Huber Heights
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dayton, OH 45424

Dupps Company Expansion
New Construction, Infrastructure - 48,000 SF
Conception
$15,000,000 CJ est. value
Germantown, OH 45327

Taco John's Restaurant / Dayton
New Construction, Infrastructure - 2,100 SF
Design
$600,000 CJ est. value
Dayton, OH 45402

Joui Wine
New Construction, Infrastructure - 1,950 SF
Design
$200,000 CJ est. value
Dayton, OH 45402

Little Ceasars
Build-Out - 1,515 SF
Post-Bid
Dayton, OH 45414

City Barbeque
New Construction
Post-Bid
Kettering, OH

General Motors Engine Plant
New Construction - 251,000 SF
Construction
$175,000,000 est. value
Brookville, OH 45309

Homefull Campus
New Construction, Infrastructure - 12,000 SF
Construction
$14,000,000 CJ est. value
Dayton, OH 45417

West Carrollton Riverfront Development
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
West Carrollton, OH 45449

Dayton Arcade Complex Phase 2
Demolition, New Construction, Renovation, Infrastructure - 7,500 SF
Pending Verification
$41,000,000 CJ est. value
Dayton, OH 45402

Buc-ee's / Huber Heights
New Construction, Infrastructure - 74,000 SF
Conception
$15,000,000 CJ est. value
Huber Heights, OH 45424

Waffle House / Centerville
New Construction, Infrastructure - 2,000 SF
Design
$600,000 CJ est. value
Dayton, OH 45458

Chuck E. Cheese #555 / Miamisburg
Renovation - 10,383 SF
Post-Bid
$1,619,748 est. value
Miamisburg, OH 45342

Sheetz / Huber Heights
New Construction, Infrastructure - 7,786 SF
Construction
$1,000,000 CJ est. value
Huber Heights, OH 45424

Enson Market
Addition, Demolition, Infrastructure - 6,000 SF
Pending Verification
$2,000,000 CJ est. value
Dayton, OH 45449

Last Updated 09/18/2023 01:11 PM
Project Title

Trotwood Salem Mall Redevelopment

Physical Address View project details and contacts
City, State (County) Trotwood, OH 45426   (Montgomery County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Food/Beverage Service, Manufacturing/Processing Plant
Contracting Method Bids by Invitation
Project Status Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $22,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to redevelop a former mall into a mixed use development. Further scope details have not been provided. As of September 18, 2023 the project is nearing completion of its environmental review process to receive funding. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, Remodeling, Remodeling. 1 Story Above Grade, Remodeling, Remodeling.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Laboratory Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents