Similar Projects
Tub/Sink/Countertop Resurfacing Services
Bidding
Phenix City, AL

Lobby Renovation
Bidding
Childersburg, AL 35044

Village Residence Halls - Interior Refurbishments and New Furnishings (Phase I)
Post-Bid
Auburn, AL 36849

Ceiling Tile Materials
Post-Bid
Mobile, AL 36618

Mary Harmon Bryant Mold Remediation Room 431-Attic Conditioning
Results
Less than $300,000 est. value
Tuscaloosa, AL

A Propose Facade and Storefront Retrofit for the Boaz Retail Building
Results
Less than $498,000 est. value
Boaz, AL

Convert to ADA Amp 2- Unit Type B 752 B Mallory
Bidding
Alexander City, AL

FEDEX Brookley Field - Mobile Ramp Modifications
Post-Bid
Mobile, AL 36615

Ceiling Repairs at Northwoods Community
Results
Less than $270,000 est. value
Huntsville, AL 35816

Hurricane Damage (Wall/Roof) Repairs at 1960 South Broad Street
Bidding
Mobile, AL 36615

Football Stadium Concessions Countertops
Post-Bid
Mobile, AL

New Cabinets and Tile for Fire Station 1
Results
Fairhope, AL 36533

Fine Arts Building Interior Finishes Upgrade
Post-Bid
Normal, AL 35762

LED Light Fixtures
Results
Mobile, AL 36618

LED Light Fixtures and Accessories
Post-Bid
Dothan, AL 36301

Reported 12/21/2020 12:49 PM
Project Title

Conversion to ADA - 736 B Mallory

Physical Address View project details and contacts
City, State (County) Alexander City, AL   (Tallapoosa County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all tools, equipment, labor and material (except items noted below) to complete the project per drawings and specifications* All Work shall comply with 2010 ADA Standards for Accessible Design -*Mechanical Closet door to be 2’-4” -*A 2” Bathroom floor drain with trap primer will be added by Contractor -*14 gauge wire is not allowed -*Shower Unit will be ADA compliant pre-fab fiberglass unit -*Replace Security Screen Latches with Single point latch -*Construct firewall in the attic space at adjoining apartment if needed -Contractor will remove debris left in unit and dispose of it in the container located at the Maintenance Facility -Contractor shall keep site safe and secure at all times, provide for construction debris removal (no debris left more than 48 hrs), and provide toilet facilities (to be locked when not in use) The Housing Authority will provide the following Material: -Screen Doors- Use existing if suitable -Heat Pump- Use Existing (Type B requires new) -Wall Mount Air Handler -Duct Material for Heating/Cooling Unit -Sink and Vanity Faucets -Shower Valve -Toilet(s) -Lights and Ceiling Fans -Range vent hood, bath exhaust fan -VCT and glue, Ceramic tile for bath -Paint -Door Locks and Keys -Single point Security Screen Latches

Details

Division 09 - Finishes.
Division 10 - Specialties, Compartments and Cubicles, Shower and Dressing Compartments, Plastic Shower and Dressing Compartments.
Division 22 - Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents