Similar Projects
Automatic Irrigation Improvement Project
Alteration
Bidding
Golden Valley, MN 55426

Lawn Care and Landscaping Services- Groups 1,2 and 3
Term Contract
Post-Bid
Brooklyn Park, Golden Valley, Medina, Minnetonka, Plymouth, Spring Park, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Vincent Avenue North Sanitary and Storm Sewer
Renovation
Results
Minneapolis, MN 55401

Medina Country Club Sewer Rehabilitation
Results
$108,000 est. value
Medina, MN 55340

Grounds Maintenance
Post-Bid
Bloomington, MN

Pond and Storm Sewer Maintenance
Results
Bloomington, Minneapolis, MN

2021 Aquatic Vegetation Management
Term Contract
Post-Bid
Bloomington, MN

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

Appaloosa Woods Area Street Reconstruction
Post-Bid
Maple Grove, MN

Phase 4 Street and Utility
Results
Minneapolis, MN

Huntington Farms East and West Area Street Reconstruction
Post-Bid
Maple Grove, MN

2021 Infrastructure Improvements
Results
$1,500,000 to $2,000,000 est. value
MN

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

2021 Hidden Oaks Lane/Woods Trail/Coneflower Circle Improvement Project
Results
$1,270,000 est. value
Champlin, MN 55316

Last Updated 12/08/2021 12:15 PM
Project Title

Pond and Storm Sewer Maintenance

Physical Address View project details and contacts
City, State (County) Bloomington, MN   (Hennepin County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Landscaping/Irrigation, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Approximately 127 trees clearing and grubbing, 2. Approximately 121 remove storm sewer pipe, 3. Approximately 19,990 cubic yards of common excavation and regulated landfill disposal, 4. Approximately 47,295 cubic yards of channel and pond excavation, 5. Approximately 1 lump sum of dewatering, 6. Approximately 1 lump sum of construct and maintain access roads, 7. Approximately 30 trees (B & B), 8. Approximately 362 cubic yards of topsoil borrow, and 9. Approximately 3,276 square yards of seeding and erosion control blanket.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents