Similar Projects
Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

West Salem Wastewater Pump Station Improvements - 0001063 - City of Salem
Renovation, Infrastructure
Conception
$22,510,140 CJ est. value
Salem, OR 97301

Region 2 (Central and South) Curve Warning Upgrades
Infrastructure
Design
$1,692,760 CJ est. value
Silverton, OR 97381

I-5: N. Santiam - Kuebler
Infrastructure
Design
$6,469,100 CJ est. value
Salem, OR 97317

Aircraft Factory
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Portland, OR 97232

North Marion Transfer Station Concrete Repair 2022
Infrastructure
Bidding
$900,000 CJ est. value
Woodburn, OR 97071

Pringle Elementary School
Addition, Demolition, Alteration
Post-Bid
Salem, OR

Water Improvements Pavement Repair
Infrastructure
Post-Bid
$250,000 CJ est. value
Detroit, OR 97342

Water Storage Tank Inspection/Cleaning
Term Contract
Results
Toppenish, WA

Evans Haven
Infrastructure
Results
$1,935,000 CJ est. value
Gates, OR 97346

Water Street Mixed Use
New Construction, Infrastructure
Pending Verification
$2,700,000 CJ est. value
Silverton, OR 97381

Waldo Avenue Southeast/Wildwind Drive Southeast - Pipe Rehabilitation - 0000223 - City of Salem
Infrastructure
Conception
$2,650,000 CJ est. value
Salem, OR 97301

2022 Silverton Cured-in-Place Pipe (CIPP) Project
Infrastructure
Bidding
$500,000 CJ est. value
Silverton, OR 97381

Cathodic Protection Services
Infrastructure
Post-Bid
Salem, OR

Bill Riegel Park Phase 2 Site Improvements
Renovation, Infrastructure
Results
$350,000 to $450,000 est. value
Salem, OR 97317

Last Updated 08/22/2022 08:03 PM
Project Title

The Provision and Installation of a New Fuel Tank Leak Detection and Tank Monitoring System

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pre Bid Conference: N/A The provision and installation of a new fuel tank leak detection and tank monitoring system The Marion County Public Works Department is soliciting written quotes from vendors for: The provision and installation of a new leak detection and tank monitoring system, equivalent to the Franklin Fueling EVO 200/400 Series Tank Monitoring system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents