Similar Projects
I-90/SR 261 EB and WB Bridges - Structure Rehabilitation
Infrastructure, Renovation
Conception
$5,169,000 CJ est. value
Moses Lake, WA 98837

I-90/SR 261 EB and WB Bridges - Structure Rehabilitation
Infrastructure, Renovation
Conception
$5,169,000 CJ est. value
Moses Lake, WA 98837

Priest Rapids Recreation Area Dredging and Bank Stabilization
Infrastructure
Design
$425,000 CJ est. value
Mattawa, WA 99349

Fence Restoration
Infrastructure
Design
$150,000 CJ est. value
Krupp, WA 98832

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Dodson Road Overlay
Infrastructure
Post-Bid
Ephrata, WA

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

U-SE Road Overlay
Infrastructure
Results
$1,903,263 est. value
Ephrata, WA

Miscellaneous COF Upgrades
Infrastructure
Results
$470,000 est. value
Moses Lake, WA

8th Street and Selkirk Avenue Improvements
Infrastructure
Construction
$410,145 CJ est. value
Mattawa, WA 99349

8th Street and Selkirk Avenue Improvements
Infrastructure
Construction
$410,145 CJ est. value
Mattawa, WA 99349

SR 24/I-82 to Riverside Rd - ADA Compliance
Infrastructure
Conception
$321,000 CJ est. value
Mattawa, WA 99349

Residential Subdivision
New Construction, Infrastructure
Design
Soap Lake, WA 98851

Ephrata School District Grant Elementary Modernization and Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$17,000,000 CJ est. value
Ephrata, WA 98823

Last Updated 09/07/2022 04:32 AM
Project Title

I-90/Wilson Creek Bridge WB - Deck Rehabilitation

Physical Address View project details and contacts
City, State (County) Moses Lake, WA 98837   (Grant County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $946,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID 509011A19 The bridge deck on the Wilson Creek Bridge near Ellensburg on westbound I-90 is showing signs of deterioration due to normal wear. This project will repair and resurface the existing bridge deck to maintain the structural integrity, continue safe operation of the highway, and extend the life of the bridge. As of September 07, 2022, this project is in Design status. Preliminary engineering is expected to begin in the first quarter of 2021 and environmental design is expected to be completed in the third quarter of 2022. The contract advertisement is expected in fourth quarter of 2022 and construction is anticipated to be operationally complete in the fourth quarter of 2023. WSDOT - I-90/Wilson Creek Bridge WB - Deck Rehabilitation *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents