Similar Projects
Last Updated | 10/03/2023 01:00 PM |
Project Title | RFQ Contractor - Community of Phippsburg Wastewater Treatment Plant |
Physical Address | View project details and contacts |
City, State (County) | Phippsburg, CO 80469 (Routt County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Storage/Water Tanks |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected May 2024 |
Bids Due | View project details and contacts |
Estimated Value | $450,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Community of Phippsburg Wastewater Treatment Plant Request for Qualifications (RFQ) for Prequalification of Contractors for the Wastewater Treatment System Improvement Project Pre-Qualification: Yes The Routt County Environmental Health Department owns and manages the wastewater treatment system for the Community of Phippsburg. The facility is rated to treat 30,000 gallons per day. It is seeking Statements of Qualifications from qualified contractors to replace the existing wastewater treatment system. The new facility will feature a containerized Membrane Bioreactor (MBR) treatment process. The existing 1980s lagoon treatment system will be emptied of its contents and decommissioned. The following is a partial list of the anticipated services required from the general contractor: Mobilization Permits Excavation Site work and erosion control Utility connections Installation of a cast-in-place concrete tank Procurement of treatment equipment Installation of loose treatment process equipment Piping connections between the container and loose equipment installed in the basins Installation of line voltage from transformer to containerized system Electrical connections for equipment installed in the basins Backup power generation Removal of the sludge in the existing lagoons Reclamation of the existing lagoons Startup services Warranty support Question Deadline 10/27/2023 Mobilization o Permits o Excavation o Site work and erosion control o Utility connections o Installation of a cast-in-place concrete tank o Procurement of treatment equipment o Installation of loose treatment process equipment o Piping connections between the container and loose equipment installed in the basins o Installation of line voltage from transformer to containerized system o Electrical connections for equipment installed in the basins o Backup power generation o Removal of the sludge in the existing lagoons o Reclamation of the existing lagoons o Startup services o Warranty support The following renderings are cross-sections of the project showing how the containerized treatment equipment arrives at the site with most of the treatment equipment already installed inside the containers. The treatment equipment manufacturer will provide the equipment for the concrete basins loose for installation by the contractor |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |