Similar Projects
East Substation Transmission Upgrades - City of Pella
Infrastructure
Conception
$360,000 CJ est. value
Pella, IA 50219

North Plant to East Substation Bus Tie - City of Pella
Infrastructure
Conception
$660,000 CJ est. value
Pella, IA 50219

W. Washington Street and Fifield Road Intersection Improvements
Infrastructure
Design
$291,255 CJ est. value
Pella, IA 50219

W. Washington Street and Fifield Road Intersection Improvements
Infrastructure
Design
$291,255 CJ est. value
Pella, IA 50219

RFQ D/B - 2-Phase Design-Build for Lake Red Rock and Saylorville Lake Administrative, Visitor Center and Maintenance Buildings
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Knoxville, IA 50138

2022 Sidewalk Repair Program
Infrastructure
Post-Bid
$600,000 CJ est. value
Pella, IA 50219

PCC Patching
Infrastructure
Results

Granular Surfacing of Roadway
Infrastructure
Results

Pella Corporation Airport Hangar Addition
Addition, Demolition, Infrastructure - 2,800 SF
Pending Verification
$3,000,000 CJ est. value
Pella, IA 50219

Old 163 Storage
New Construction, Infrastructure
Pending Verification
$5,500,000 CJ est. value
Pella, IA 50219

Idaho Drive Underground Conversion - City of Pella
Infrastructure
Conception
$350,000 CJ est. value
Pella, IA 50219

Knoxville Hospital & Clinics Emergency Department Expansion
Addition, New Construction, Infrastructure
Design
$21,000,000 CJ est. value
Knoxville, IA 50138

Parking Improvements Pella Corporation
Infrastructure
Post-Bid
$339,015 CJ est. value
Pella, IA 50219

250th Avenue Reconstruction
Infrastructure
Results
$429,776 est. value
Pella, IA 50219

Southside Beautification - 201.5.09.7236.6799 - City of Pella
New Construction, Infrastructure
Conception
$729,000 CJ est. value
Pella, IA 50219

Last Updated 07/05/2023 03:34 PM
Project Title

VA Park Trail Connection

Physical Address View project details and contacts
City, State (County) Knoxville, IA 50138   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $376,982 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The project includes pavement removal, grading, excavation, one (1) sanitary sewer manhole plugging, 20 linear feet of 12" CMP storm sewer pipe, 124 SY of 7" PC concrete pavement, 145 linear feet of curb and gutter removal and replacement, 3,732 SY of PC concrete trail, 12 CY of combination sidewalk retaining wall, 20 linear feet of fence removal, two (2) rectangular rapid flashing beacon assemblies, pavement markings, traffic control, surface restoration, erosion control, and other miscellaneous work. Time for Commencement and Completion of Work. Work on the improvements shall commence any time after a written Notice to Proceed is issued and shall be completed as stated below. The Notice to Proceed will be issued after the preconstruction conference and following approval of contracts and bonds, which is expected to occur on Monday, July 17, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents