Similar Projects
31st Street Bridge over METRA Electrical & Illinois Central Railroad
New Construction, Infrastructure
Bidding
Chicago, IL 60677

Shabbona Resurfacing
Renovation, Infrastructure
Bidding
Park Forest, IL 60466

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Storm Sewer Improvements
Post-Bid
$1,000,000 to $5,000,000 est. value
Flossmoor, IL 60422

Storm Sewer Cleaning And Televising - Saratoga Farms
Results
Chicago Heights, IL 60411

Replacement of 650 Ft. of Bikepath, Installation of Storm Sewer
Results
Bartlett, IL 60103

Palatine Strip Mall Facade & Sewer Improvements
Renovation, Alteration
Pending Verification
Palatine, IL 60067

North of Willow Stormwater Projects
Infrastructure
Bidding
$40,000 est. value
Winnetka, IL 60093

Willow Walk Subdivision Drainage Improvements
Post-Bid
Arlington Heights, IL

Brown Park Stormwater Improvements
Results
Less than $48,000 est. value
Orland Park, IL 60462

15th Street Sewer Separation Project
Alteration
Bidding
$700,000 est. value
Forest Park, IL

2021 Sewer Repairs
Infrastructure
Post-Bid
Chicago Heights, IL

Weathersfield Way Relief Sewer and Rear Yard Improvements
Results
Schaumburg, IL

Public Storm Sewer - West Bryn Mawr Avenue and North Washington Street
Infrastructure
Bidding
$159,778 est. value
Chicago, IL 60656

Playfield Subdivision Phase 3 Storm Sewer Rehabilitation
Alteration
Post-Bid
Crestwood, IL 60803

Last Updated 04/19/2022 08:41 AM
Project Title

Storm Sewers Installation

Physical Address View project details and contacts
City, State (County) Riverside, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements performance bond in the sum of the consist of the removal of the existing amount of the contract in dollars alley pavements and garage aprons; guaranteeing the proper completion installation of storm sewers and of the work and the maintenance of drainage structures; installation the work during the period of one of permeable aggregate trenches (1) year from and after the date of and base course; installation the completion and acceptance of permeable interlocking brick of the same. The Contractor shall pavers; installation of concrete furnish a satisfactory payment bond alley pavements and garage in the full amount of the Contract aprons; parkway restoration; and all guaranteeing payment of all material appurtenant work thereto. used and for all labor performed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents