Similar Projects
Mineral Street Sidewalk Improvements
Infrastructure
Bidding
$165,000 est. value
Springfield, VT 05156

ST Albans Road Parking Lot Replacement
Infrastructure
Bidding
$300,000 to $350,000 est. value
Georgia, VT 05478

Slip Formed Concrete Curbing 2021
Post-Bid
Rutland, VT

Patio Replacement/ Sidewalk Addition
Post-Bid
Bennington, VT 05201

Sharon Elementary School Parking Lot Maintenance Drive Improvements
Results
$99,751 est. value
Sharon, VT 05065

North Country Union High School Bus Loop
Results
Newport, VT 05855

Slate Valley Walking Trail
New Construction - 3,600 SF
Construction
Less than $15,000 est. value
Poultney, VT 05764

Castle Trail Improvements
Infrastructure
Post-Bid
Jericho, VT

Main Street Pedestrian Bridge
Results
$649,790 est. value
Plainfield, VT 05667

Colchester Causeway Connector Path Construction
Infrastructure
Post-Bid
Colchester, VT

Dorset NH 019-2 (24)
Results
$1,000,000 to $2,500,000 est. value
Dorset, VT

Camp Smith Universally Accessible Trail Phase 2
Infrastructure
Post-Bid
Waterbury, VT

Village West Sidewalk Project (Waitsfield Village STP BP(13)4/STP BP16(5))
Results
$250,000 to $500,000 est. value
Waitsfield, VT

Kennedy Drive at West Twin Oaks Terrace Mid-Block Pedestrian Crossing
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
South Burlington, VT

Blair Park Sidewalk Project - Williston STP BP17(12)
Results
Less than $250,000 est. value
Williston, VT

Last Updated 06/24/2022 09:31 AM
Project Title

Trail Restoration Project

Physical Address View project details and contacts
City, State (County) Northfield, VT 05663   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project site is located at the end of Slate Ave. and on Norwich University property. The trail connects to trails within the Northfield Town Forest. The Town of Northfield has written permission from Norwich to perform the proposed work. May 28, 2022 Contract execution August 30, 2022 Project completion Questions in writing must be sent via email to Jeff Schulz, Town Manager @ jschulz@northfield.vt.us. or by phone at 802-485-9822. The Town of Northfield received grant funding through the Vermont Outdoor Recreation Economic Collaborative Program (VOREC) to restore and improve damaged trails in Northfield and is seeking bids from qualified contractors to perform the trail restoration work in an area which is approximately several hundred feet in length. Photos of the project area are attached. The work consists of the replacement of five culverts, swale ditching and seeding, and the filling and stabilization of two washout areas at the lower end of the near the end of Slate Ave. In addition, the Town is seeking a bid for trail restoration work on a section of the trail located at the upper sections of the trail - approximately 1/4 mile from the end of Slate Ave. This section will require the installation of several culverts and drainage ditching. In addition, there is a stream crossing, a washed-out area, and several wet places in need of drainage. We are open to creative ideas from the contractor. See attached photos. The contractor shall utilize current State of Vermont Standards and Specification for Erosion and Sediment Control Measures within all site limits, disturbed areas, and the steep slopes along the nearby stream.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents