Similar Projects
O'Reilly Auto Parts (FWT) / Falling Waters
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Falling Waters, WV 25419

Health Department Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Martinsburg, WV 25403

Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Stony River Br
Demolition, New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Mount Storm, WV 26739

Chilled Water Line Replacement Bldg. 500
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Martinsburg, WV 25405

Post-Harvest Site Preparation Services
Alteration
Post-Bid
Durbin, WV 26264

Post-Harvest Site Preparation Services
Alteration
Post-Bid
Durbin, WV 26264

Giles Mill Road Water Main Extension
Infrastructure
Results
Bunker Hill, WV 25413

Arcadia Springs North Phase 2 Water Main
Infrastructure
Results
Martinsburg, WV 25405

Meadow River Trail Russellville Bridge Replacement
Demolition, New Construction, Infrastructure
Construction
$981,245 CJ est. value
Fayetteville, WV 25840

Sidewalk
Infrastructure
Construction
$141,765 CJ est. value
Clay, WV 25043

The Villas at Warm Springs
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Martinsburg, WV 25401

Martinsburg Land Warehouse
New Construction, Infrastructure
Pending Verification
$108,000,000 CJ est. value
Inwood, WV 25428

Menards - Charles Pointe Crossing / Bridgeport
New Construction, Infrastructure - 200,000 SF
Design
$12,000,000 CJ est. value
Bridgeport, WV 26330

Replacing Existing Storm Drainpipes and Drop Inlets
Infrastructure
Bidding
$8,000,000 CJ est. value
Ronceverte, WV 24970

Last Updated 04/01/2023 05:07 AM
Project Title

Crogan Pump Station Area Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Kingwood, WV 26537   (Preston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $198,670 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All work as described below shall be substantially complete within 60 calendar days after the date when the Contract Times commence to run and completed and ready for final payment within 90 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000 per day. The removal of seven (7) existing residential grinder pump stations, the installation of approximately 1,700 LF of gravity sewer to connect into the existing sanitary sewer system, and other necessary appurtenances. Envelope No. 1 will be opened first and the Bid Opening Requirement items checked for compliance as outlined on the Bid Opening Checklist on page BOR-1 of these contract documents. If such documents are found to be in order, Envelope No. 2 Bid Proposal, will then be opened and will be publicly read aloud. If the documents required to be contained in Envelope No. 1 are not in order, Envelope No. 2 Bid Proposal will not be opened and the Bid will be considered non-responsive and will be returned to the Bidder. A bidder may not withdraw the Bid for a period of ninety (90) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to City of Kingwood in an amount equal to five percent (5%) of the base bid. Bidders must comply with the Title VI of the Civil Rights Act of 1964, the Copeland AntiKickback Act, and the Contract Works Hours Safety Standards Act. Contractor is required to provide the Drug Free Workplace Certification in accordance with WV Code 21-ID-5. All Bidders are required to have a West Virginia Contractors License per Section 21-11-11 of the West Virginia Code. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents