Similar Projects
Job Order Contracts - Flooring Contracting Services
Alteration
Bidding
Redwood City, CA

Vinyl Flooring Installation and Repair
Alteration
Bidding
$100,000 est. value
Sacramento, CA

Hardwood Synthetic Sports Flooring
Post-Bid

Hardwood Synthetic Sports Flooring
Post-Bid

FEMA Region 9 Non-Static VCT Flooring
Term Contract
Results
Oakland, CA 94607

Orchard Dale Elementary School Modernization Project- Flooring
Alteration
Results
Whittier, CA 90603

Oak Park Dance Floor Repair
Alteration
Bidding
$93,000 est. value
Santa Barbara, CA 93102

PKA - Bldg 665 & 664 LVT Flooring
Term Contract
Post-Bid
Travis AFB, CA

Riverside County Law Library Paint and Carpet Project
Alteration
Results
$500,000 est. value
Indio, Riverside, CA 92201

PKA - BLDG 243, 130, 942 LVT Flooring
Term Contract
Post-Bid
Travis AFB, CA

City Council Chambers Renovations
Alteration
Results
Palm Desert, CA 92260

Peralta Community College - Wide Deep Cleaning and Floor Waxing
Alteration
Post-Bid
Oakland, CA 94606

City Hall and CD Annex Carpet Replacement
Alteration
Results
Calimesa, CA 92320

O&M Basewide Carpet
Term Contract
Post-Bid
Fairfield, Travis AFB, CA 94534

Blackbox Stage Floor Replacement Costa Mesa High School
Alteration
Results
Costa Mesa, CA 92626

Last Updated 12/29/2021 02:42 PM
Project Title

City Hall North Wing Tile Replacement

Physical Address View project details and contacts
City, State (County) Palm Desert, CA 92260   (Riverside County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the removal of approximately 800 SF of existing tile, grout and vinyl cover base; preparation of area; installation of 24" x 24" carpet squares, tile and grout; installation of 12"x12" square tile squares with 3/16" - 1/4" grout spacing (grout to be darker thank tiles and sanded); installation of 4" vinyl cove base, installation of transitions; and removal and disposal of all debris.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents