Similar Projects
Contract for the Purchase of a Submersible Pump
Post-Bid
San Antonio, TX

Well Plugging and Related Services: Padre Island National Seashore
Post-Bid
Austin, TX 78701

Construction of a New Water Well and Related Improvements
Results
TX

Plugging Abandoned Water Well
Results
$1,320 est. value
Irving, TX

Repair/Recondition One 50,000 GPM Vertical Centrifugal Water Pump (P-203)
Post-Bid
Baytown, TX 77520

Saws Water Well Mitigation Program
Results
Less than $97,000 est. value
San Antonio, TX

Water Well No. 2
Post-Bid
TX

Well Construction and Plugging of Existing Wells at the Fuller and Far North Well Sites
Results
TX

Granger Pines WWTP Site Work and Wet Well
Post-Bid
Conroe, TX 77301

Water Well Facilities for Pinewood Trails
Results
Less than $2,389,444 est. value
Cleveland, TX 77327

Well No. 2 Replacement
Post-Bid
Anthony, TX

Plant 1 Improvements Contract 1 Water Wells #6 and #7
Results
$650,000 est. value
Tyler, TX 75706

IFB Turbo Pump
Post-Bid
College Station, TX 77845

Exploration Well
Results
$176,600 est. value
Bullard, TX 75757

Rockwall Heath High School Well Repair
Post-Bid
Heath, TX 75032

Last Updated 12/02/2020 10:23 AM
Project Title

Repair and Install Variable Frequency Drive on Irrigation Well 8

Physical Address View project details and contacts
City, State (County) Bushland, TX 79012   (Potter County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The USDA, ARS, Plains Area Conservation and Production Research Lab in Bushland, TX, has a requirement for the repair and installation of a variable frequency drive (VFD) on Irrigation Well 8. The objectives are to remove an existing submersible pump and motor, inspect the well casing and screen by video image, and to install and test a new variable frequency drive (VFD) control and submersible motor and pump for Irrigation Well 8.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents