Similar Projects
Orange County Corrections Phoenix Chiller Replacement
Bidding
Less than $645,000 est. value
Orlando, FL 32839

Mechanical/HVAC Trade Contract Services
Bidding
Ocala, FL

Mechanical Renovations at Horizon Middle School & Kissimmee Middle School
Post-Bid
Less than $1,900,000 est. value
Kissimmee, FL 34746

HVAC Maintenance
Post-Bid
Jacksonville, FL 32203

City Hall Rooftop Air Conditioner Units Replacement
Results
$48,104 est. value
Oldsmar, FL 34677

MCCH - HVAC Replacement AHU #28
Term Contract
Results
West Palm Beach, FL 33401

Maintenance and Service for HVAC Systems
Bidding
FL

Chiller Replacement, Sundial Mid-Core Parking Deck
Post-Bid
Saint Petersburg, FL 33701

Governmental Center (GCC) HVAC Replacement AHU 3N
Term Contract
Results
West Palm Beach, FL 33401

Replacement of Two (2) HVAC Units at the Clay County Jail
Bidding
Green Cove Springs, FL 32043

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

District Seven FCO Tampa Ops HVAC System Replacement
Bidding
Less than $74,000 est. value
Tampa, FL 33619

Removal and Replacement of 75 A/C Rooftop Condensing Units at Maxwell Terrace Apartments - Building 1
Post-Bid
Orlando, FL 32805

FSU Facilities Chiller PM and Minor Repairs Services
Results
Tallahassee, FL 32306

Last Updated 04/21/2021 09:21 AM
Project Title

Design/Build Services HVAC System Bldg 1326, Eglin AFB

Physical Address View project details and contacts
City, State (County) Eglin AFB, FL   (Okaloosa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of this project is to remove the existing HVAC system in its entirety and replace it with new. This includes ductwork, AHU’s, controls, and all associated equipment. The work also requires the modification or replacement of the existing fire suppression and fire alarm systems. This project includes, but is not limited to the following, Design Build the removal and replacement of the HVAC System including ductwork, AHUs, controls and associated equipment along with the modification or replacement of the existing fire suppression and fire alarm system located in Bldg. 1326 on Eglin AFB. All work shall be performed in accordance with the Statement of Work (SOW) dated 12 May 2020 and the Amendment dated 07 July 2020. The performance period is 330 days after the Notice to Proceed (NTP). The above general description of work does not in any way limit the responsibility of the contractor to perform all work and furnish all labor, materials, and equipment in accordance with the specifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents