Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Multi Commercial Development - Sitework
Infrastructure
Construction
Lehigh Acres, FL 33971

The Waters of Cape Coral
New Construction, Infrastructure - 83,500 SF
Construction
$22,000,000 CJ est. value
Cape Coral, FL 33991

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

Engineering, Planning and Development
Post-Bid

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

Y--Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Firm Fixed Price Multiple Award Construction Contract, NAVFAC SE Area of Operations
Results
$20,000,000 to $900,000,000 est. value

Last Updated 08/10/2022 08:31 PM
Project Title

RFP Design - Lee County Medical Examiner Office Expansion

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33907   (Lee County)
Category(s) Government/Public, Heavy and Highway, Professional Services
Sub-Category(s) Architectural, Engineering, Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Lee County Board of County Commissioners seeks to contract for qualified CONSULTANT services to provide architectural, civil, structural, and Mechanical, Electrical, and Plumbing (MEP) professional design services; as well as construction phase services for the project known as the Lee County Medical Examiner Expansion. Then and there to be publicly opened and read aloud for the purpose of selecting a vendor to furnish; all necessary labor, services, materials, equipment, tools, consumables, transportation, skills and incidentals required for Lee County, Florida, in conformance with proposal documents, which include technical specifications and/or a scope of work. Questions regarding this Request for Proposal are to be directed, in writing, to the individual listed below using the email address listed below or faxed to (239) 485 8383 during normal working hours. Brian Boehs, bboehs@LeeGov.com Liquidated Damages: Damages paid usually in the form of monetary payment, agreed by the parties to a contract which are due and payable as damages by the party who breaches all or part of the contract. May be applied on a daily basis for as long as the breach is in effect The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents