Similar Projects
Mill and Overlay, Sign Replacement, ADA Work
Infrastructure
Conception
$1,900,000 CJ est. value
Chanhassen, MN 55318

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

County State-Aid Highway 24 shoulder widening from County State-Aid Highway 10 to Hennepin County Line - 158794 - Carver County
Infrastructure
Design
$6,252,422 CJ est. value
Watertown, MN 55388

Full Depth Reclaim, Mill and Overlay and Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Sleepy Eye, MN 56085

Highway 20/25 Intersection Project
Infrastructure
Bidding
$975,726 CJ est. value
Chaska, MN 55318

County State-Aid Highway 41 Bridge
Infrastructure
Bidding
$1,425,000 CJ est. value
San Francisco Township, MN 55322

Bemidji Area West Zone Grading
Infrastructure
Post-Bid
Bemidji, MN

DNR R2 McGrath Power Shovel Excavation
Infrastructure
Post-Bid
McGrath, MN 56350

Regional Drinking Water Project Contract A - Wells 7 and 8 Construction
Renovation - 156,816 SF
Results
Cloquet, MN 55720

Silver Lake Water Quality Improvement
Infrastructure
Results
$128,936 CJ est. value
Chanhassen, MN 55317

Siegle Property Housing Development
New Construction
Construction
Waconia, MN 55387

Andover High School Storage Garage Addition
Addition, Renovation, Infrastructure
Construction
$197,440 CJ est. value
Andover, MN 55304

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

229th Avenue NW Townhomes
New Construction, Infrastructure
Conception
$4,100,000 CJ est. value
Saint Francis, MN 55070

Last Updated 11/22/2022 10:01 PM
Project Title

Heron Lake Dam Repair

Physical Address View project details and contacts
City, State (County) Heron Lake, MN 56137   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $307,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Dams/Reservoirs, Construction Description: SUMMARY OF WORK (SEE SECTION 01 10 00 FOR FULL SCOPE OF WORK) A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Field verification of site conditions 2. Procurement of new hydraulic equipment 3. Demolition of existing gate operating hydraulic equipment 4. Installation of new hydraulic cylinders (with rod locks) 5. Installation of hydraulic power unit with control panel and associated equipment 6. Replacement of gate arm stops and gate position indicator 7. Supply of generator and wiring of generator receptacle to control panel

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents