Similar Projects
Project Luna / 1111 Akron Way
New Construction, Infrastructure
Design
$33,000,000 CJ est. value
Forney, TX 75126

Crossroads at Terrell Phase II
New Construction - 366,000 SF
Design
$43,000,000 est. value
Terrell, TX

Paving Improvements for Windmill Farms Phase 6B
Infrastructure
Bidding
$2,848,218 CJ est. value
Forney, TX 75126

Grading Improvements for Eastland, Phase 3B
Infrastructure
Bidding
$1,958,000 CJ est. value
Kaufman, TX 75142

Grading Improvements for Eastland, Phases 1B and 1C
Infrastructure
Post-Bid
TX

Earthwork Improvements to Serve Arbordale Village 2
Infrastructure
Post-Bid
TX

Grading Improvements for Eastland, Phases 1A and 2A
Infrastructure
Results
TX

Walden Pond West Phase 1 Grading Improvements
Infrastructure
Results
TX

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Business Park / Forney
New Construction, Infrastructure - 1,100,000 SF
Pending Verification
$46,000,000 CJ est. value
Forney, TX 75126

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Design
$696,000 CJ est. value
Kaufman, TX 75142

Road Repair/Asphalt Overlay for Pct. 4 Road and Bridge
Infrastructure
Bidding
$200,000 CJ est. value
Kaufman, TX 75142

Construction of the Grading Improvements or Wildcat Ranch, Phase 4
Infrastructure
Post-Bid
TX

Walden Pond South Phase 1 Grading Improvements
Infrastructure
Results
TX

Project Owl / Building 1
New Construction, Infrastructure - 817,400 SF
Pending Verification
$32,000,000 CJ est. value
Forney, TX 75126

Last Updated 10/31/2022 10:44 AM
Project Title

Lux at Gateway

Physical Address View project details and contacts
City, State (County) Forney, TX 75126   (Kaufman County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 31, 2022 the project is in design and construction is expected to start first quarter 2023. Information regarding a general contractor has not been confirmed.

Details

282,736 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents