Similar Projects
Gym Air Conditioning at Middle/High School
Renovation
Design
$205,666 CJ est. value
Crivitz, WI 54114

Northstar Middle School Chiller, Boiler Replacement and Longfellow Elementary School Condensing Unit Replacement
Renovation
Sub-Bidding
$60,000 CJ est. value
Eau Claire, WI 54701

Wastewater Treatment Plant Boiler and System Update
Renovation
Sub-Bidding
$300,000 CJ est. value
Antigo, WI 54409

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

Jail Cooling Tower Replacement
Results
Portage, WI 53901

Administration Building Heat Pump Replacement Phase 3
Results
Kenosha, WI 53140

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Levis Water Heater Replacement
Renovation
Construction
$79,550 CJ est. value
Black River Falls, WI 54615

Remodeling of the Forest County Courthouse
Alteration
Post-Bid
Crandon, WI 54520

Replacing the HVAC Pneumatic Compressor
Results
Darlington, WI 53530

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Clinton Rose Senior Center Second Boiler Install and Exhaust Fans Replacement and Mcgovern Senior Center Exhaust Fans Replacement
Results
Milwaukee, WI 53212

NWHC Replacement of Air Handling Unit - FS-06
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Madison, WI

Replacement of Air-Cooled Chiller and Pump- Rogers Street Academy
Results
Milwaukee, WI 53204

Last Updated 11/22/2022 04:25 AM
Project Title

Boiler Replacement for Julian Thomas

Physical Address View project details and contacts
City, State (County) Racine, WI 53404   (Racine County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $149,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 09/06/2022 at 10:00 AM CT Questions from the floor at the Pre-Bid meeting must also be presented in writing. All questions will be addressed in an addendum and posted to online Disconnect, remove and dispose of two (2) existing PK boilers Furnish and install two (2) new Riello Array high efficiency condensing boilers: a. 2,000 MBH b. 208/230 volt Single Phase c. BACnet Communication interface- work with Siemens

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents