Similar Projects
Asphalt Bids
Infrastructure
Post-Bid
$400,000 est. value
Chili, WI 54420

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

South 4th Street
Infrastructure
Results
$500,000 est. value
Dorchester, WI 54425

2022 Street and Utility Improvements (West School and North Church Streets)
Infrastructure
Results
$490,000 est. value
Thorp, WI 54771

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Concrete Repair and/or Replacement at the Black River View Apartments
Infrastructure, Renovation
Post-Bid
$25,000 CJ est. value
Greenwood, WI 54437

Business Park Improvements project
Infrastructure
Results
$1,674,413 CJ est. value
Owen, WI 54460

Concession Stand and Press Box
New Construction, Infrastructure
Post-Bid
$542,241 CJ est. value
Abbotsford, WI 54405

Countryside Estates Subdivision, Cedar Street (9th St. to South), 8th Street (Cedar Street to East), B Street (8th Street to 7th Street) Project
Infrastructure
Results
$609,951 CJ est. value
Owen, WI 54460

Salt Shed and Fuel Island
New Construction, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Neillsville, WI 54456

Wastewater Treatment Plant Upgrades
New Construction, Renovation, Infrastructure
Results
$8,397,000 CJ est. value
Thorp, WI 54771

Clark County Highway Facility
New Construction, Infrastructure - 37,385 SF
Post-Bid
$12,000,000 CJ est. value
Loyal, WI 54446

RFP D/B - Snowmobile Trail Bridge Design Build and Installation - Cloverdale
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Neillsville, WI 54456

Creating a Onemile Section of Walking Trail between South Gwinn Street and County Highway K, and Chickadee Road to Loyal Cemetery- Phase 1
Infrastructure
Post-Bid
$500,000 CJ est. value
Loyal, WI 54446

Last Updated 10/16/2023 01:35 AM
Project Title

2023 Swampbuck Drive Extension

Physical Address View project details and contacts
City, State (County) Abbotsford, WI 54405   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $501,338 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City of Abbotsford 2023 Swampbuck Drive Extension Est. Completion Date: July 31, 2024 The work for which bids are asked includes the following: Swampbuck Drive extension consists of new roadway and utility construction, approximately 700-feet. The project will include utility installation of watermain, sanitary sewer, and storm sewer infrastructure. Other associated work will include grading and construction of a stormwater management infiltration basins. The roadway construction will consist of with a width of 37-feet from back of curb to back of curb with 30-inch curb and gutter. The roadway section will consist of SAS fabric, underdrain, 16-inches of breaker, 8-inches of base aggregate, and 4-inches of asphalt pavement. The project will have a milestone completion for utility installation and base aggregate driving surface by November 30, 2023 and final completion July 31, 2024. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 146 North Central Avenue, Suite 201, Marshfield, WI 54449The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents