Similar Projects
Reported | 12/11/2018 11:09 AM |
Project Title | Pentagon - North Village ACP and Perimeter Fence |
Physical Address | View project details and contacts |
City, State (County) | Baltimore, MD (Baltimore County) |
Category(s) | Single Trades |
Sub-Category(s) | Fencing |
Contracting Method | Competitive Bids. |
Project Status | All Bids Rejected |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Original Set Aside: Competitive 8(a): Pentagon - North Village ACP and Perimeter Fence: project will be to construct a new pedestrian access control point (PACP) prior to entry into the Pentagon at Corridor 8 with precast concrete walls, metal roof, and pier foundation. The scope includes all required security equipment and systems; intrusion detection system, information system (IT/communications); safety and surveillance measures; screening and unauthorized visitor personnel and hazardous materials detection capabilities; systems commissioning; utility services; lighting, heating, ventilation and air conditioning in conformance with current criteria. Built-in equipment includes entry portals for access control. Pedestrian Bridge Structural Enhancements include beam retrofit and modification and pier foundation to accommodate facility load. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development will be included in the design and construction of this project as appropriate. Information systems include basic telephone, computer network, fiber optic, cable television, security and fire alarm systems and infrastructure. Supporting facilities include demolition of the existing temporary pedestrian access control point and guard post all electric, information systems/IT/communication, water, sewer utility services, storm drainage, concrete walkway, ramp, paving, curbs, gutters, exterior lighting, and landscaping. | ||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |